4 - WORKING OPERATIONS
4-14
Machine Placement
Follow this procedure when placing the Kwik-Pit into its
working position:
1. Clear the area of bystanders, especially small children,
before starting.
2. Be sure there is enough clearance from obstructions and
other equipment to move the machine into its working
position.
3. Attach the Kwik-Pit to the towing vehicle.
Kwik-Pit To Towing Vehicle" On Page 3-9)
4. Back the machine up to the staged position the recieving
conveyor while it is in it’s raised position.
Fig. # 4-26 Back the Machine up to the Working Position
6. Slowly back up the Kwik-Pit until the
“Discharge Spout”
A
is over the
“Intake of the Secondary Conveyor“
B
A
B
Fig. # 4-27 Working Position: Position Discharge Spout
Over Intake Of Secondary Conveyor
7. Unhook the unit from the towing-vehicle and lower to the
ground.
(See "Detaching Kwik-Pit From The Towing Vehicle" On
(See "Jack" On Page 4-3)(See "Lift Axle Raise / Lower
(See "Lift Axle Raise / Lower Control Lever" On Page
8. If necessary, remove the hitch from the machine to prevent
interfering with other equipment.
9. Review the Workplace Safety Diagram for your model
prior to starting work. Follow all setup instructions and
do not allow any unauthorized people into the working
10. Reverse the above procedure when removing the
machine from its working position.
Summary of Contents for Kwik-Pit 26 Series
Page 2: ......
Page 10: ...1 4 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 46: ...2 SAFETY INFORMATION 2 36 This Page Is Intentionally Left Blank...
Page 58: ...3 TRANSPORT OPERATIONS 3 12 This Page Is Intentionally Left Blank...
Page 116: ...5 MAINTENANCE 5 38...
Page 118: ...5 MAINTENANCE 5 40 This Page Is Intentionally Left Blank...
Page 120: ...6 TROUBLESHOOTING 6 2 This Page Is Intentionally Left Blank...
Page 126: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 132: ......