![Nortel M3905 Installation And Administration Manual Download Page 159](http://html.mh-extra.com/html/nortel/m3905/m3905_installation-and-administration-manual_1706164159.webp)
Appendix A: Flash Download procedure
Page 159 of 174
M3900 Series Meridian Digital Telephones Description, Installation and Administration
Table 21 summarizes the required steps to perform this procedure.
Perform a data dump
1
Load the Equipment Data Dump Program (LD 43). At the prompt, enter:
LD 43
to load the program
2
When EDD000 appears on the terminal, enter:
EDD
to begin the data
dump.
3
When “DATABASE BACKUP COMPLETE” or “DATADUMP
COMPLETE” appears on the terminal, enter:
****
to exit the program.
Table 21
Option 81C CP PII parallel reload summary
Step
Action
1
Perform a data dump.
2
STAT the hardware.
3
Split the Cores.
4
Install the PSDL file on Core/Net 1.
5
Switch call processing from Core/Net 0 to Core/Net 1.
6
Test Core/Net 1.
7
Test Core/Net 1.
8
Install PSDL file on Core/Net 1.
9
Exiting split mode
10
Test Core/Net 1 and Core Net 0.
11
Perform a data dump.
CAUTION
If the data dump is not successful, do not continue;
contact your technical support organization. A data
dump problem must be corrected before proceeding.
Summary of Contents for M3905
Page 2: ......
Page 4: ...Page 4 of 174 553 3001 216 Standard 5 00 January 2002 ...
Page 12: ...Page 12 of 174 About this document 553 3001 216 Standard 5 00 January 2002 ...
Page 44: ...Page 44 of 174 Functional description 553 3001 216 Standard 5 00 January 2002 ...
Page 54: ...Page 54 of 174 Hardware options 553 3001 216 Standard 5 00 January 2002 ...
Page 104: ...Page 104 of 174 Installation 553 3001 216 Standard 5 00 January 2002 ...
Page 170: ...Page 170 of 174 Appendix A Flash Download procedure 553 3001 216 Standard 5 00 January 2002 ...
Page 174: ...Page 174 of 174 List of terms 553 3001 216 Standard 5 00 January 2002 ...
Page 175: ...1 ...