![Nortel M3905 Installation And Administration Manual Download Page 151](http://html.mh-extra.com/html/nortel/m3905/m3905_installation-and-administration-manual_1706164151.webp)
Appendix A: Flash Download procedure
Page 151 of 174
M3900 Series Meridian Digital Telephones Description, Installation and Administration
2
Switch Cores and test the other side (Core/Net 0)
SCPU
Switch cores
TEST CPU Test the inactive Core/Net
TEST CNI c s Test each inactive CNI card
Note:
Testingthe CP and CNI cards and synchronizingmemory can
take up to 20 minutes for each test. When the CP test is complete, the CP
and the memory is automatically synchronized.
3
Clear the display and minor alarms on both Cores.
CDSP
Clear the displays on the Cores
CMAJ
Clear major alarms
CMIN ALL Clear minor alarms
4
Get the status of the Cores, CNIs, and memory.
STAT CPU Get the status of both Cores
STAT CNI Get the status of all configured CNIs and memory
Note:
You may need to execute the STAT CNI command twice before
receivinga response from the system.
**** exit program
Summary of Contents for M3905
Page 2: ......
Page 4: ...Page 4 of 174 553 3001 216 Standard 5 00 January 2002 ...
Page 12: ...Page 12 of 174 About this document 553 3001 216 Standard 5 00 January 2002 ...
Page 44: ...Page 44 of 174 Functional description 553 3001 216 Standard 5 00 January 2002 ...
Page 54: ...Page 54 of 174 Hardware options 553 3001 216 Standard 5 00 January 2002 ...
Page 104: ...Page 104 of 174 Installation 553 3001 216 Standard 5 00 January 2002 ...
Page 170: ...Page 170 of 174 Appendix A Flash Download procedure 553 3001 216 Standard 5 00 January 2002 ...
Page 174: ...Page 174 of 174 List of terms 553 3001 216 Standard 5 00 January 2002 ...
Page 175: ...1 ...