Appendix A: Flash Download procedure
553-3001-216 Standard
5.00
January 2002
STAT the hardware
1
Load LD 137 and get the status of the hard disks.
Note:
Be sure the hard disks are synchronized. If not, synchronize
before proceeding.
LD 137
STAT
Get the status of the hard disks
SYNC
Synchronize hard disks if necessary. Synchronization may take
up to 50 minutes
TEST CMDU
Performs hard and floppy disk test.
****
exit program
2
Load LD 135 and get status of the CPs, CNIs and memories.
LD 135
STAT CPU
Get the status of both CPs and memory
STAT CNI
Get the status of all configured CNIs
3
Test the standby (inactive) CP. Then switch CPs, and test again.
TEST CPU
Test standby (inactive) CP
Wait until the terminal returns a complete test message. The message
HWI533 or HWI534 does not mean the test has completed!
SCPU
Switch CPs
TEST CPU
Test the standby (inactive) CP
Note:
Testingthe CPs can take up to 20 minutes for each test. When the
test is complete, the memories are automatically synchronized.
Split the Cores
1
Be sure CP 0 is active and CP1 is standby. You may need to switch CPs
again:
STAT CPU
****
exit program
Summary of Contents for M3905
Page 2: ......
Page 4: ...Page 4 of 174 553 3001 216 Standard 5 00 January 2002 ...
Page 12: ...Page 12 of 174 About this document 553 3001 216 Standard 5 00 January 2002 ...
Page 44: ...Page 44 of 174 Functional description 553 3001 216 Standard 5 00 January 2002 ...
Page 54: ...Page 54 of 174 Hardware options 553 3001 216 Standard 5 00 January 2002 ...
Page 104: ...Page 104 of 174 Installation 553 3001 216 Standard 5 00 January 2002 ...
Page 170: ...Page 170 of 174 Appendix A Flash Download procedure 553 3001 216 Standard 5 00 January 2002 ...
Page 174: ...Page 174 of 174 List of terms 553 3001 216 Standard 5 00 January 2002 ...
Page 175: ...1 ...