24
Hardware installation and configuration
3
Securely install the rail kit and then slide the server into place.
4
Ensure the server is supported in the rear by the rail kit.
5
Bolt the front of the server to the front of the rail kit.
--End--
Connect the hardware
For more information about the front and rear panels of the AS 5300
server, see
Figure 1 "Front panel of the AS 5300 server" (page 25)
and
Figure 2 "Rear panel of the AS 5300 server" (page 25)
.
Application Server 5300
Nortel AS 5300 Installation
NN42040-300
01.04
4 November 2008
Copyright © 2007-2008 Nortel Networks
.
Summary of Contents for Application Server 5300
Page 123: ......