Configuring PoE using the Web-based Management Interface
167
Item
Description
Power to the dropped ports is restored when the power
requirement becomes lower than the power budget.
When several ports have the same priority, the port
with the higher port number is dropped.
Volt (v)
The voltage supplied by the port.
Current (mA)
The current supplied by the port.
Power (W)
The power supplied by the port.
Nortel Ethernet Routing Switch 4500 Series
Overview — System Configuration
NN47205-500
02.01
Standard
5.0
23 February 2007
Copyright © 2007, Nortel Networks
Nortel Networks Confidential
.