Melter control switch (on/off)
Heaters LED
Automatic scan sequence
Ready LED
Air pressure gauge
Operation
4-4
Part 1024496_06
2014
Nordson Corporation
Starting the Melter
Before starting the melter for the first time, confirm that the
melter is fully installed including any required inputs and outputs, gun
drivers, pattern controllers, and timers
melter's operating parameters are set up to support the
current manufacturing process
Refer to Section 3,
Installation
, if any of the items listed above are
not complete.
To start the melter
1. Switch the melter on.
The melter:
Tests the control panel LEDs
Turns on the heaters (the heaters LED turns green)
Begins to automatically scan through and display the
actual temperature of the tank and each hose and gun that has a
set‐point temperature that is greater than zero degrees. The
sequence of the automatic scan is: tank, each hose and gun pair, and
then back to the tank.
Turns on the ready LED (green) when the tank and all of the
hoses and guns are within 3
C (5
F) of their assigned
set‐point temperature.
NOTE:
Appendix D contains a functional description of the pump.
2. Check the air pressure gauge on the front of the melter to confirm that the
operating air pressure is set correctly.
NOTE:
The minimum operating air pressure is 0.7 bar (10 psi).
Operating the melter with the air pressure set to less than 0.7 bar (10 psi)
may cause the pump to function erratically.
Summary of Contents for ProBlue P10
Page 10: ...Table of Contents viii Part 1024496_06 2014 Nordson Corporation...
Page 22: ...Safety 1 12 2014 Nordson Corporation Issued 10 11...
Page 37: ...Installation 3 7 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 53: ...Installation 3 23 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 61: ...Installation 3 31 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 65: ...Installation 3 35 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 69: ...Installation 3 39 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 78: ...Installation 3 48 Part 1024496_06 2014 Nordson Corporation...
Page 108: ...Operation 4 30 Part 1024496_06 2014 Nordson Corporation...
Page 125: ...Troubleshooting 6 7 Part 1024496_06 2014 Nordson Corporation Figure 6 1 Electrical components...
Page 138: ...Troubleshooting 6 20 Part 1024496_06 2014 Nordson Corporation Figure 6 6 Removing the pump...
Page 170: ...Parts 7 6 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 177: ...Parts 7 13 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 181: ...Parts 7 17 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 212: ...Technical Data 8 8 Part 1024496_06 2014 Nordson Corporation...
Page 213: ...Technical Data 8 9 Part 1024496_06 2014 Nordson Corporation...
Page 214: ...Technical Data 8 10 Part 1024496_06 2014 Nordson Corporation...
Page 215: ...Technical Data 8 11 Part 1024496_06 2014 Nordson Corporation...
Page 216: ...Technical Data 8 12 Part 1024496_06 2014 Nordson Corporation...
Page 217: ...Technical Data 8 13 Part 1024496_06 2014 Nordson Corporation...
Page 218: ...Technical Data 8 14 Part 1024496_06 2014 Nordson Corporation...
Page 219: ...Technical Data 8 15 Part 1024496_06 2014 Nordson Corporation...
Page 220: ...Technical Data 8 16 Part 1024496_06 2014 Nordson Corporation...
Page 224: ...Calculating Melter Power Requirements A 4 Part 1024496_06 2014 Nordson Corporation...
Page 248: ...Operating Parameters B 24 Part 1024496_06 2014 Nordson Corporation...
Page 260: ...Melter Communications C 12 Part 1024496_06 2014 Nordson Corporation...
Page 315: ...400 480 Volt ProBlue Adhesive Melters E 21 Part 1024496_06 2014 Nordson Corporation...
Page 318: ...400 480 Volt ProBlue Adhesive Melters E 24 Part 1024496_06 2014 Nordson Corporation...