Installation
3-5
Part 1024496_06
2014
Nordson Corporation
Ventilation
See Figure 3‐2. ProBlue melters are cooled by convection. Air is drawn in
through openings in the chassis of the melter and is exhausted out of the
ventilation slots at the top of the melter.
CAUTION!
Do not block the air intake openings and ventilation slots.
Figure 3‐2
Melter cooling
Electrical Power
Before installing the melter, ensure that the melter will not be overloaded and
that the plant's electrical service is rated to handle the power required by the
melter and the hoses and guns that you plan to use.
Refer to Appendix A,
Calculating Melter Power Requirements
, for information
about how to calculate the maximum allowable hose lengths and gun
wattages that can be used in your manufacturing application.
WARNING!
Risk of electrocution! Install a lockable power disconnect switch
between the electrical service and the melter. Failure to install or properly
use the disconnect switch when servicing the melter can result in personal
injury, including death.
Summary of Contents for ProBlue P10
Page 10: ...Table of Contents viii Part 1024496_06 2014 Nordson Corporation...
Page 22: ...Safety 1 12 2014 Nordson Corporation Issued 10 11...
Page 37: ...Installation 3 7 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 53: ...Installation 3 23 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 61: ...Installation 3 31 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 65: ...Installation 3 35 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 69: ...Installation 3 39 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 78: ...Installation 3 48 Part 1024496_06 2014 Nordson Corporation...
Page 108: ...Operation 4 30 Part 1024496_06 2014 Nordson Corporation...
Page 125: ...Troubleshooting 6 7 Part 1024496_06 2014 Nordson Corporation Figure 6 1 Electrical components...
Page 138: ...Troubleshooting 6 20 Part 1024496_06 2014 Nordson Corporation Figure 6 6 Removing the pump...
Page 170: ...Parts 7 6 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 177: ...Parts 7 13 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 181: ...Parts 7 17 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 212: ...Technical Data 8 8 Part 1024496_06 2014 Nordson Corporation...
Page 213: ...Technical Data 8 9 Part 1024496_06 2014 Nordson Corporation...
Page 214: ...Technical Data 8 10 Part 1024496_06 2014 Nordson Corporation...
Page 215: ...Technical Data 8 11 Part 1024496_06 2014 Nordson Corporation...
Page 216: ...Technical Data 8 12 Part 1024496_06 2014 Nordson Corporation...
Page 217: ...Technical Data 8 13 Part 1024496_06 2014 Nordson Corporation...
Page 218: ...Technical Data 8 14 Part 1024496_06 2014 Nordson Corporation...
Page 219: ...Technical Data 8 15 Part 1024496_06 2014 Nordson Corporation...
Page 220: ...Technical Data 8 16 Part 1024496_06 2014 Nordson Corporation...
Page 224: ...Calculating Melter Power Requirements A 4 Part 1024496_06 2014 Nordson Corporation...
Page 248: ...Operating Parameters B 24 Part 1024496_06 2014 Nordson Corporation...
Page 260: ...Melter Communications C 12 Part 1024496_06 2014 Nordson Corporation...
Page 315: ...400 480 Volt ProBlue Adhesive Melters E 21 Part 1024496_06 2014 Nordson Corporation...
Page 318: ...400 480 Volt ProBlue Adhesive Melters E 24 Part 1024496_06 2014 Nordson Corporation...