Calculating Melter Power Requirements
A-1
Part 1024496_06
2014
Nordson Corporation
Appendix
A
Calculating Melter Power Requirements
Before locating the melter on the production floor or attaching hoses and
guns to the melter, you must calculate the electrical power required by the
hoses and guns and confirm that the required power does not exceed
maximum allowable wattages. Properly calculating melter power
requirements will prevent damage to the melter and identify the maximum
allowable distance between the melter and the point at which the hot melt is
dispensed.
The following three maximum wattages must be considered when calculating
the power required by the hoses and guns.
Single‐component maximum
—The wattage of any single hose or
gun
Hose/gun pair maximum
—The wattage of any hose and gun
(hose/gun pair)
Hose/gun module maximum
—The wattage of any two hoses and
two guns (two hose/gun pairs)
If your Nordson representative has already calculated the hose/gun power
requirements and confirmed that the maximum allowable wattages will not be
exceeded, then no further calculation is necessary. However, you should
re‐evaluate the hose and gun power requirements before you:
add a new hose or gun to the melter that was not factored into the
original wattage evaluation
replace an existing hose with a longer hose or an existing gun with a
larger gun
Summary of Contents for ProBlue P10
Page 10: ...Table of Contents viii Part 1024496_06 2014 Nordson Corporation...
Page 22: ...Safety 1 12 2014 Nordson Corporation Issued 10 11...
Page 37: ...Installation 3 7 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 53: ...Installation 3 23 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 61: ...Installation 3 31 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 65: ...Installation 3 35 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 69: ...Installation 3 39 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 78: ...Installation 3 48 Part 1024496_06 2014 Nordson Corporation...
Page 108: ...Operation 4 30 Part 1024496_06 2014 Nordson Corporation...
Page 125: ...Troubleshooting 6 7 Part 1024496_06 2014 Nordson Corporation Figure 6 1 Electrical components...
Page 138: ...Troubleshooting 6 20 Part 1024496_06 2014 Nordson Corporation Figure 6 6 Removing the pump...
Page 170: ...Parts 7 6 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 177: ...Parts 7 13 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 181: ...Parts 7 17 Part 1024496_06 2014 Nordson Corporation This page intentionally left blank...
Page 212: ...Technical Data 8 8 Part 1024496_06 2014 Nordson Corporation...
Page 213: ...Technical Data 8 9 Part 1024496_06 2014 Nordson Corporation...
Page 214: ...Technical Data 8 10 Part 1024496_06 2014 Nordson Corporation...
Page 215: ...Technical Data 8 11 Part 1024496_06 2014 Nordson Corporation...
Page 216: ...Technical Data 8 12 Part 1024496_06 2014 Nordson Corporation...
Page 217: ...Technical Data 8 13 Part 1024496_06 2014 Nordson Corporation...
Page 218: ...Technical Data 8 14 Part 1024496_06 2014 Nordson Corporation...
Page 219: ...Technical Data 8 15 Part 1024496_06 2014 Nordson Corporation...
Page 220: ...Technical Data 8 16 Part 1024496_06 2014 Nordson Corporation...
Page 224: ...Calculating Melter Power Requirements A 4 Part 1024496_06 2014 Nordson Corporation...
Page 248: ...Operating Parameters B 24 Part 1024496_06 2014 Nordson Corporation...
Page 260: ...Melter Communications C 12 Part 1024496_06 2014 Nordson Corporation...
Page 315: ...400 480 Volt ProBlue Adhesive Melters E 21 Part 1024496_06 2014 Nordson Corporation...
Page 318: ...400 480 Volt ProBlue Adhesive Melters E 24 Part 1024496_06 2014 Nordson Corporation...