
PRELIMINARY: 24-Sep-2021
Page 69
002536MAN-00
Compressor Replacement Procedure
1. Pump down the unit as per the Pumpdown Procedure above.
If there was a compressor burn out (motor failure), the
refrigerant cannot be reused and must be disposed of according to local codes
.
2. Disconnect piping.
3. Replace the compressor. Replace the liquid line filter-dryer. Always ensure nitrogen is flowing through the system
at the lowest flow rate that can be felt at the discharge during any brazing procedures to prevent soot buildup inside
the pipes.
4. Vacuum the unit as per above procedure.
5. If there was a compressor burnout:
a)
Charge the unit with
new
refrigerant and operate it for continuously for 2 hours. Pump down the unit and replace
the filter-dryer. Vacuum the unit as per above procedure.
b)
Charge the unit (refrigerant can be re-used) and operate it for 2-3 days. Perform an acid test. If it fails, pump
down the unit and replace the filter-dryer.
c)
Charge the unit (refrigerant can be re-used) and operate it for 2 weeks. Perform and acid test. If it fails, pump
down the unit and replace the filter-dryer.
6. Charge the unit a final time. Unit should now be clean and repeated future burn-outs can be avoided.
Summary of Contents for ATWC Series
Page 15: ...PRELIMINARY 24 Sep 2021 Page 15 002536MAN 00...
Page 16: ...PRELIMINARY 24 Sep 2021 Page 16 002536MAN 00...
Page 17: ...PRELIMINARY 24 Sep 2021 Page 17 002536MAN 00...
Page 18: ...PRELIMINARY 24 Sep 2021 Page 18 002536MAN 00...
Page 20: ...PRELIMINARY 24 Sep 2021 Page 20 002536MAN 00...
Page 21: ...PRELIMINARY 24 Sep 2021 Page 21 002536MAN 00...
Page 22: ...PRELIMINARY 24 Sep 2021 Page 22 002536MAN 00...
Page 23: ...PRELIMINARY 24 Sep 2021 Page 23 002536MAN 00...
Page 24: ...PRELIMINARY 24 Sep 2021 Page 24 002536MAN 00...
Page 25: ...PRELIMINARY 24 Sep 2021 Page 25 002536MAN 00...
Page 26: ...PRELIMINARY 24 Sep 2021 Page 26 002536MAN 00...
Page 27: ...PRELIMINARY 24 Sep 2021 Page 27 002536MAN 00...
Page 28: ...PRELIMINARY 24 Sep 2021 Page 28 002536MAN 00...
Page 31: ...PRELIMINARY 24 Sep 2021 Page 31 002536MAN 00...
Page 81: ...PRELIMINARY 24 Sep 2021 Page 81 002536MAN 00...
Page 82: ...PRELIMINARY 24 Sep 2021 Page 82 002536MAN 00...
Page 83: ...PRELIMINARY 24 Sep 2021 Page 83 002536MAN 00...
Page 84: ...PRELIMINARY 24 Sep 2021 Page 84 002536MAN 00...
Page 85: ...PRELIMINARY 24 Sep 2021 Page 85 002536MAN 00...
Page 86: ...PRELIMINARY 24 Sep 2021 Page 86 002536MAN 00...
Page 87: ...PRELIMINARY 24 Sep 2021 Page 87 002536MAN 00...
Page 88: ...PRELIMINARY 24 Sep 2021 Page 88 002536MAN 00...
Page 89: ...PRELIMINARY 24 Sep 2021 Page 89 002536MAN 00...
Page 90: ...PRELIMINARY 24 Sep 2021 Page 90 002536MAN 00...
Page 91: ...PRELIMINARY 24 Sep 2021 Page 91 002536MAN 00...
Page 92: ...PRELIMINARY 24 Sep 2021 Page 92 002536MAN 00 Dimensions ATWC 45 55...
Page 93: ...PRELIMINARY 24 Sep 2021 Page 93 002536MAN 00 Dimensions ATWC 45 55...
Page 94: ...PRELIMINARY 24 Sep 2021 Page 94 002536MAN 00 Dimensions ATWC 65...
Page 95: ...PRELIMINARY 24 Sep 2021 Page 95 002536MAN 00 Dimensions ATWC 65...
Page 96: ...PRELIMINARY 24 Sep 2021 Page 96 002536MAN 00 Dimensions ATWC 75 80 100...
Page 97: ...PRELIMINARY 24 Sep 2021 Page 97 002536MAN 00 Dimensions ATWC 75 80 100...