
17
4.4.2 Mounting on the Boom
Figure 12 – Main Roll Sensor Mounting Locations
1.
When mounting the UC4 main roll sensor and target, first, determine whether
your sprayer will allow the roll sensor to be mounted in front of the boom
(preferred).
NOTE: Sprayers that use parallel links to move the main section usually
allow for the sensor and target to be mounted in front of the
boom. Some sprayers using a vertical main rack system will not
allow them to be mounted in front of the boom.
2.
Determine a proper mounting location for the main roll sensor and target.
Following are
General Mounting Rules
for the sensor and target, and the
details are shown in
Figure 13
and
Figure 14
:
•
The sensor must have a 12-inch diameter clear view of the ground without any
obstructions (e.g. Nozzles, Hoses, Fenders).
•
The sensor and target are to be mounted as far outward from the center of the
boom as possible (See FRONT VIEW of
Figure 14
).
•
The sensor and target are to be mounted as low as possible while maintaining
the height requirements as shown in
Figure 13
.
•
The bottom of the sensor should be between 18" to 22" above the target as shown
in
Figure 13
.
•
Ensure that there will be no contact between the sensor/target and the booms
when folding and unfolding.
Summary of Contents for SPRA-COUPE 7000 Series
Page 9: ...7 Figure 3 Hydraulic Plumbing Schematic ...
Page 17: ...15 Figure 9 Spra Coupe Wing Sensor Mounting ...
Page 21: ...19 Figure 14 Installation Details ...
Page 27: ...25 Figure 21 Valve Block Mounting Location Figure 22 Valve Block Mounting Example ...
Page 29: ...27 Figure 23 Boom Cylinder Plumbing ...
Page 37: ...35 5 3 ITEM C3 44656 VALVE CABLE VARIABLE RATE 5 4 ITEM C4 44651 VALVE EXTENSION CABLE ...
Page 38: ...36 5 5 ITEM C10 44650 38 POWER CABLE SPRA COUPE 7000 CABLE A ...
Page 39: ...37 5 6 ITEM C10 44650 38 POWER CABLE SPRA COUPE 7000 CABLE B ...
Page 40: ...38 5 7 ITEM C11 44658 15 JAM VALVE CABLE SPRA COUPE 7000 ...
Page 41: ...39 NOTES ...
Page 42: ...40 NOTES ...