
10
manual control of boom functions. In
Section 4.7
, this procedure is repeated
with the UC4 System installed for comparison and troubleshooting purposes.
Table 3 – Boom Test Record (WITHOUT UC4 System)
Working RPM:
Section:
Trial #1
[Seconds]
Trial #2
[Seconds]
Trial #3
[Seconds]
Average
Time
[Seconds]
Left UP
Left
DOWN
Right UP
Right
Down
Main UP
Main
DOWN
Roll
CW
Roll
CCW
Table 4 – Boom Test Record (WITH UC4 System)
Working RPM (Set this the same as in Table 3):
Section:
Trial #1
[Seconds]
Trial #2
[Seconds]
Trial #3
[Seconds]
Average
Time
[Seconds]
Left UP
Left
DOWN
Right UP
Right
DOWN
Main UP
Main
DOWN
Roll
CW
Roll
CCW
Summary of Contents for SPRA-COUPE 7000 Series
Page 9: ...7 Figure 3 Hydraulic Plumbing Schematic ...
Page 17: ...15 Figure 9 Spra Coupe Wing Sensor Mounting ...
Page 21: ...19 Figure 14 Installation Details ...
Page 27: ...25 Figure 21 Valve Block Mounting Location Figure 22 Valve Block Mounting Example ...
Page 29: ...27 Figure 23 Boom Cylinder Plumbing ...
Page 37: ...35 5 3 ITEM C3 44656 VALVE CABLE VARIABLE RATE 5 4 ITEM C4 44651 VALVE EXTENSION CABLE ...
Page 38: ...36 5 5 ITEM C10 44650 38 POWER CABLE SPRA COUPE 7000 CABLE A ...
Page 39: ...37 5 6 ITEM C10 44650 38 POWER CABLE SPRA COUPE 7000 CABLE B ...
Page 40: ...38 5 7 ITEM C11 44658 15 JAM VALVE CABLE SPRA COUPE 7000 ...
Page 41: ...39 NOTES ...
Page 42: ...40 NOTES ...