TITAN 912L Actuator
INSTALLATION REFERENCE MANUAL
MX4685 REV. A ©2019 Nice/HySecurity, 6705 S 209th St, Ste 101, Kent, WA 98032 - TF: 800-321-9947 www.hysecurity.com |
19
1. Open the actuator mechanical release, remove two torx 25 screws, and lift off cover.
2. Remove plastic cap covering the two adjustment wheels (IMAGE 10-1).
3. Press the CLOSE button on the control board. The gate should close until it hits the CLOSE limit
switch (LED = RED).
4. If the CLOSE limit is not acceptable (gate closed too far or not enough), re-open the gate partially
and then turn the turn the EXTEND Adjustment Wheel a few revolutions in “extend more” or
“extend less” direction as needed, then press CLOSE button on the Control Board again to check.
5. Check gate and repeat Steps 4-5 as necessary until CLOSE limit is acceptable.
6. Press the OPEN button on control board. The gate should open until it hits the OPEN limit switch
(LED = GREEN).
7. If the OPEN limit is not acceptable (gate open too far or not open all the way), re-close the gate
partially and then turn the RETRACT Adjustment Wheel a few revolutions in “retract more” or
“retract less” direction and press OPEN button on the Control Board again to check.
8. Check gate and repeat Steps 7-8 as necessary until OPEN limit is acceptable.
9.
When finished, replace plastic cap on switches, affix actuator cover with two screws, engage
mechanical release, and lock.
10A
SETTING ACTUATOR FINE LIMITS: PULL-TO-OPEN
IMPORTANT!
The actuator key MUST be left with the customer. The key is necessary if the gate must be manually
opened in the event of loss of power.
IMPORTANT NOTE FOR DUAL GATE SYSTEMS!
If a dual gate system, only the primary actuator should be connected to the control board at this point. After
determining limits for the first actuator per INSTRUCTION 10A or 10B (below), unplug it from the Motor
1 input and plug in the secondary actuator to the MOTOR 1 input, then repeat steps in INSTRUCTION
10A or 10B for the second actuator. When finished, plug first actuator back onto MOTOR 1 input, and the
secondary actuator into the MOTOR 2 input.
After installation of the control box (per separate installation instructions), the first operation to perform after
the board has scanned for monitored safety devices is to ensure the open and close limits are acceptable.
Refer to INSTRUCTION 10A or 10B to determine open and close limits. To “teach” limits to the control board,
see seperate control box installation manual.
SECTION 6: SETTING ACTUATOR FINE LIMITS