8
3.1.3 Assembling the baffles and removeable internal parts.
See figures 1 to 1.7
All stove internal parts are assembled at manufacture, however with movements and handling
during stove delivery it is possible that some or all the located parts inside the stove may have
moved, therefore it is
important to check
all these parts for correct position and fitment after the
stove is located. Check the 2 baffles and all other parts are located into correct positions including
side bricks, back brick, main grate, banking bar and ash pan. Before lighting the stove for the first
time, confirm the baffle and all parts are in correct location.
Location of non bolted stove internal parts
.
See Figure 1
Drawing of parts that are not bolt fixed to the inside of stove that may have moved during
transportation. These parts must be checked to ensure they are in correct location before lighting
the stove.
Fig 1
Summary of Contents for Windermere 5 SE
Page 9: ...9 Fig 1 1 Main grate positioning Fig 1 2 Top steel baffle positioning...
Page 12: ...12 Fig 1 6 Banking bar positioning Fig 1 7 Ash pan positioning...
Page 52: ...52 4 9 Part Identification Windermere 5 SE...
Page 54: ...54 5 0 Declaration of Performance Energy label Product Fiche 5 1 Declaration of Performance...
Page 55: ...55 5 2 Energy Label...