10
Fig 1.3
Top (lower) vermiculite baffle positioning.
Fig 1.4 Left & right-hand side brick positioning.
Note: The vermiculite lower baffle will require to be raised to the front edge to allow the side
bricks to be installed against the internal sides of stove after which the lower baffle is lowered into
correct position on top of both side bricks.
Summary of Contents for Windermere 5 SE
Page 9: ...9 Fig 1 1 Main grate positioning Fig 1 2 Top steel baffle positioning...
Page 12: ...12 Fig 1 6 Banking bar positioning Fig 1 7 Ash pan positioning...
Page 52: ...52 4 9 Part Identification Windermere 5 SE...
Page 54: ...54 5 0 Declaration of Performance Energy label Product Fiche 5 1 Declaration of Performance...
Page 55: ...55 5 2 Energy Label...