- 25 -
SUPER P
www.NewLeader.com
(800) 363-1771
301321-AA-I
Installation Instructions Continued
Installing Body
Be careful when drilling so as to not damage truck frame, gas tank, or any other important
components� Failure to follow this requirement may result in injury or machine damage�
DO NOT WELD ON VEHICLE FRAME! Such welding can lead to fatigue cracking and must
be avoided�
Connect welders ground directly to one of the items being welded anytime an arc welder
is used on the vehicle or anything connected to the vehicle� Refer to Manufacturer’s
instructions�
Disconnect electrical components from electrical system when welding on equipment to
prevent component damage due to power surges or excessive current� Failure to follow this
requirement may result in injury or machine damage�
1� Lower the pickup or dump body tailgate� Remove the tailgate if it cannot be lowered into a
horizontal position�
2� Carefully lift the spreader and set it in the truck box�
3� Center the spreader from side to side, and position it as far forward as possible, providing adequate
clearance to mount spinner hopper�
4� Once spreader is positioned from front to rear, place wood blocks between the front of the spreader
and the truck body to prevent spreader from sliding forward�
5� Using the four ratchet straps or chains and load binders supplied in the mounting kit, secure
spreader to truck body at all four corners� Most truck bodies are built with standard anchor points for
securing such loads. If truck body does not have sufficient mounting points, modify as necessary.