RBU
23
EN
Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has been
performed or considered.
NOTE!
If a value is outside the limit or a result is incorrect or missing, this must be rectified
before the initial start-up and normal operation.
Unit No.
Date:
Performed by:
Description
Reference
Result
Notes
Delivery checks
Missing components
‘6.1 Delivery check’
Transport damage
‘6.1 Delivery check’
Before installation
Foundation
‘6.2.2 Foundation’
Total weight
‘Table 4-1: Technical data’
Access for maintenance
‘6.2.1 Location’
Mounting (check availability)
Optional: Maintenance switch ‘5.1 Connections’
Installation room and
ventilation openings
(indoor installation)
‘7.1 Indoor installation’
Foundation and outdoor
placement
(outdoor installation)
‘6.2.2 Foundation’,
‘7.2 Outdoor installation’
Dust collector
See dust collector manual
Duct system
‘5.1 Connections’
Optional: Pilot signal cable
‘5.1 Connections’
Start and control unit
See start and control unit manual
Exhaust air duct directed
away from unit
‘7 Installation’
Compressed air
Air lines cleaned
‘7.3 Compressed air installation’
Air pressure
‘7.3 Compressed air installation’
Clean and dry air (ISO 8573-1,
class 5)
‘7.3 Compressed air installation’
Main compressed air valve
‘7.3 Compressed air installation’
Compressed air connected
to unit
‘7.3 Compressed air installation’
Initial start-up
Maintenance switch
‘8.2 Initial start-up’
Automatic start and stop, if
fitted
‘8.2 Initial start-up’
Vacuum limiting valve
‘8.2 Initial start-up’
Motor, direction of rotation
‘8.2 Initial start-up’
Time spent in Y mode
‘8.2 Initial start-up’
Start-up valve open when
motor switch to D-mode
‘8.2 Initial start-up’
Summary of Contents for RBU 1300
Page 2: ...RBU 2 ...
Page 6: ...RBU 6 Figures 5 6 11 12 13 8 4 9 3 7 10 18 14 15 16 17 2 1 1 ...
Page 256: ......
Page 257: ...www nederman com ...