Use the procedures in this section to complete your hardware installation and power up
your system.
5.1. Perform Cleanup and Final Check
Complete your hardware installation and power up your system as follows:
1. Make sure the server frame is level and secure (if necessary, you can lower the
feet).
2. Ensure that all cables are connected, fastened securely, and bundled neatly.
3. Install filler panels from the cabinet panel kit in all unfilled spaces in the front of the
frame, as shown in
Figure 5-1
.
Caution
Recirculating air in the cabinet can cause overheating. This overheating can
result in data loss or damage to the equipment. Cover any open spaces at the
front of the cabinet with filler panels.