1.3. Tools
A number 2 Phillips screwdriver is the only tool required for installation.
Optionally, a 3-mm flat-blade screwdriver might be helpful when installing the cell
interconnect cables.
1.4. Warnings and Cautions
Observe the warnings and cautions in
Table 1-1
when installing the system. Additional
warnings and cautions are included as required throughout the document.
Table 1-1 Warnings and Cautions
Type of Note
Instruction
Warning
Wear goggles or eye protection when cutting the bands that
secure shipping containers.
Warning
Do not push on the upper portion of a server cabinet, and use
caution when moving the cabinet on its casters. The cabinet
can tip over if not handled properly.
Warning
Have two people lift each cell. A fully loaded cell weighs about
45 kg (100 lb).
Caution
Wear a wrist strap connected to a ground point when
performing maintenance on the server.
1.5. Prerequisites
Before beginning the system installation, ensure that all site-provided power sources
and cabling are in place and that the optional (but recommended) uninterruptible power
supply (UPS) is in place and functioning properly. For more information, see the
System
Planning Guide
.
Summary of Contents for NECCare Platinum Express5800/A1160
Page 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Page 8: ......
Page 14: ......
Page 28: ......
Page 36: ......
Page 52: ......
Page 76: ... 456 01805 000 ...