3-1
Section 3
Installing the System
Use the following procedures to install the hardware modules of your system.
3.1. Install the Cell
Use the following procedure to install all the cells in your system.
WARNING
Removing the cell from the box requires two people. A fully loaded cell weighs
about 50 kg (110 lb).
1. Carefully lift the cell from the box using the cell sling and place the cell on a flat
surface.
Summary of Contents for NECCare Platinum Express5800/A1160
Page 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Page 8: ......
Page 14: ......
Page 28: ......
Page 36: ......
Page 52: ......
Page 76: ... 456 01805 000 ...