2-14 Setting Up the System
After a few seconds your system begins the internal Power-On Self Tests
(POST). POST automatically checks the system board, CPU module, memory,
keyboard, and most installed peripheral devices.
!
CAUTION
Always allow POST to complete before powering down your
system.
!
CAUTION
The server management logic on your system board
monitors and logs system voltage changes. When powering
down your system you may experience a 1–5 second delay
from the time you press the push-button power on/off switch
on the front panel and your system powering down. This is
normal system operation and is required by the server
management logic.
If you have problems powering on your system, refer to Problem Solving in
Chapter 5 of this User’s Guide.
After you have successfully powered on your system, refer to "Configuring
Your System" in Chapter 3 of this User's Guide.
Summary of Contents for NEAX Express
Page 1: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Page 2: ...NEC ...
Page 3: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Page 18: ...xvi Using This Guide NEC ...
Page 38: ...1 20 System Overview ...
Page 82: ...3 30 Configuring Your System ...
Page 136: ...4 54 Disassembly and Reassembly ...
Page 158: ...5 22 Problem Solving ...
Page 164: ...6 6 Illustrated Parts Breakdown ...
Page 165: ...A System Cabling System Cabling Before You Begin Static Precautions Standard Configuration ...
Page 170: ...A 6 System Cabling ...
Page 208: ...C 20 Emergency Management Port ...
Page 209: ...D Platform Event Paging ...
Page 224: ...E 14 Connectors ...
Page 234: ...10 Glossary ...
Page 241: ...xx ...
Page 242: ... 456 01510 000 ...