![background image](http://html.mh-extra.com/html/nec/neax-express/neax-express_service-and-reference-manual_251372199.webp)
Emergency Management Port C-11
Reset
Selecting Reset from the Action menu generates the Reset dialog so that you can
remotely reset the server with post-reset options.
Reset Dialog
Options available in the dialog are:
!
System Reset
- resets the server with the selected post-reset options. This operation
is not allowed if the server is configured in RESTRICTED mode for EMP
operations.
!
Post-reset Option
- sets the post-reset option that will be effective after reset. The
options are EMP active or BIOS redirection. The default selection is EMP active.
!
Cancel
- exits the Connect dialog without any action taken.
!
Help
- displays dialog level help information.
Summary of Contents for NEAX Express
Page 1: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Page 2: ...NEC ...
Page 3: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Page 18: ...xvi Using This Guide NEC ...
Page 38: ...1 20 System Overview ...
Page 82: ...3 30 Configuring Your System ...
Page 136: ...4 54 Disassembly and Reassembly ...
Page 158: ...5 22 Problem Solving ...
Page 164: ...6 6 Illustrated Parts Breakdown ...
Page 165: ...A System Cabling System Cabling Before You Begin Static Precautions Standard Configuration ...
Page 170: ...A 6 System Cabling ...
Page 208: ...C 20 Emergency Management Port ...
Page 209: ...D Platform Event Paging ...
Page 224: ...E 14 Connectors ...
Page 234: ...10 Glossary ...
Page 241: ...xx ...
Page 242: ... 456 01510 000 ...