B-6 System Setup Utility
Launching a Task
It is possible to have many tasks open at the same time, although some tasks
may require complete control to avoid possible conflicts. The tasks achieve
complete control by keeping the task as the center of operation until the user
closes the task window.
There are three ways to launch a task:
!
In the SSU Main window, double-click on the task name under Available
Tasks to display the main window for the selected task.
!
Highlight the task name, and click on OK.
!
Use the tab and arrow keys to highlight the task name, and press the
spacebar.
System Setup Utility Main Menu Window
Summary of Contents for NEAX Express
Page 1: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Page 2: ...NEC ...
Page 3: ... S e r v i c e a n d R e f e r e n c e G u i d e NEAX Express ...
Page 18: ...xvi Using This Guide NEC ...
Page 38: ...1 20 System Overview ...
Page 82: ...3 30 Configuring Your System ...
Page 136: ...4 54 Disassembly and Reassembly ...
Page 158: ...5 22 Problem Solving ...
Page 164: ...6 6 Illustrated Parts Breakdown ...
Page 165: ...A System Cabling System Cabling Before You Begin Static Precautions Standard Configuration ...
Page 170: ...A 6 System Cabling ...
Page 208: ...C 20 Emergency Management Port ...
Page 209: ...D Platform Event Paging ...
Page 224: ...E 14 Connectors ...
Page 234: ...10 Glossary ...
Page 241: ...xx ...
Page 242: ... 456 01510 000 ...