2. Installation and Connection
Chapter 2 Preparations
2. Confirm the location of 4 core nuts on the front of the chassis.
See the figure below for locations of the core nuts (2 on the front top and 2 on the front bottom.)
Note
4 core nuts have been installed on the front of the chassis at shipment.
3. Remove one screw from the AC lock bracket on the rear of the tower conversion kit.
4. Remove the AC lock bracket.
5. Remove two CPU/IO modules from the chassis.
6. Remove the DVD drive unit from the chassis.
7. Remove the rack mount bracket (handle) from the front of chassis.
You cannot close the door with the handle being mounted.
Keep the removed handle and screws carefully. They are needed when installing the server in rack.
AC lock bracket
Tower conversion kit (on the front top)
Tower conversion kit (on the front bottom)
Express5800/R320c-E4, R320c-M4, R320d-E4, R320d-M4 User's Guide
73
Summary of Contents for Express5800/R320d-M4 Series
Page 25: ...CAUTION 44U Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 25...
Page 26: ...WARNING CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 26...
Page 28: ...CAUTION NEC Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 28...
Page 29: ...WARNING CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 29...
Page 30: ...CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 30...