2-2
Setting Up the System
Selecting a Site
The system operates reliably in a typical office environment.
Choose a site that is:
!
Near grounded, three-pronged power outlets.
Note
:
For the United States and Canada, this means a
NEMA 5-15R outlets for 100-120 VAC or NEMA 6-15R
outlets for 200-240 VAC. For other international sites, this
means three-pronged power outlets applicable for the
electrical code of the region.
!
WARNING
Be sure the power service connection is through a properly
grounded outlet.
!
CAUTION
When two power supplies are installed in the system the
power plug from each of the power supplies must be
plugged into the same common ground power outlets.
!
Clean, dust-free, and well ventilated. Front and rear ventilating openings
kept free of obstructions. Away from sources of heat, vibration or
physical shock.
!
Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
!
Spacious enough to provide at least five inches (13 centimeters) behind
the system and three inches (eight centimeters) on each side of the system
for proper cooling, airflow, and cable clearance.
!
Easily accessible for system maintenance and installation of system
upgrades.
Unpacking the System
!
WARNING
Your system weighs approximately 65 pounds (29.25 kg). If
your system contains numerous optional boards and
peripheral devices, it will weigh more. To avoid personal
injury, make sure you have someone help you lift or move
the system.
Summary of Contents for Express5800 120Ld
Page 1: ...U s e r s G u i d e EXPRESS5800 120Ld...
Page 2: ...xxx...
Page 3: ...U s e r s G u i d e EXPRESS5800 120Ld...
Page 101: ......
Page 127: ......
Page 149: ...B 22 Management Workstation Application...
Page 150: ...C System Status Hardware Support Information...
Page 161: ...10 Glossary...
Page 166: ...xx...
Page 167: ...456 01530 000...