![NARDA NBM-550 Operating Manual Download Page 86](http://html1.mh-extra.com/html/narda/nbm-550/nbm-550_operating-manual_707271086.webp)
6 Measurements with the NBM-550 and EHP-50
76
NBM-550
Narda
means that 1 s will be displayed even if an interval time of
10 s is necessary, for example. The table below shows the
relationship between span and timer interval:
Generally the measurement time or refresh rate for the
result display in LF mode depends on the selected span.
Note:
Timer logging results obtained in LF mode can be
subsequently averaged using the optionally available NBM-
TS PC software. RMS/MEAN and MEDIAN post average
evaluations are available.
Note:
Since uninterrupted measurement is not possible in LF
mode (except for WPM), the measurement results are not
summarized into Min/Max/Avg values for each
measurement interval. The Actual values are recorded once
every interval instead.
Span
Timer interval
100 Hz
≥
10 s
200 Hz
≥
5 s
500 Hz
≥
2 s
> 500 Hz
≥
1 s
Span
Measuring time
100 Hz
approx. 4 s
200 Hz
approx. 2 s
> 500 Hz
approx. 1 s
Summary of Contents for NBM-550
Page 10: ...Contents VIII NBM 550 Narda ...
Page 38: ...3 Preparing the NBM 550 for use 28 NBM 550 Narda ...
Page 52: ...4 Getting started 42 NBM 550 Narda ...
Page 88: ...6 Measurements with the NBM 550 and EHP 50 78 NBM 550 Narda ...
Page 110: ...9 PC software 100 NBM 550 Narda ...
Page 139: ...12 10 CE Declaration of Conformity Narda NBM 550 129 12 10 CE Declaration of Conformity ...
Page 140: ...12 Specifications 130 NBM 550 Narda ...
Page 142: ...12 Specifications 132 NBM 550 Narda ...
Page 146: ...13 Ordering information 136 NBM 550 Narda ...
Page 154: ...Index 144 NBM 550 Narda ...
Page 155: ......