background image

NANAWALL CSW75 OWNER’S MANUAL

on the opposite side of the single/double action end 
panel (Panel #2)

 and add blue masking tape underneath 

the approximate location of the locking bolt. Slowly and 
carefully engage the locking point until it touches 
the tape. The tip of the locking bolts should make 
a mark on the blue tape that would be the center point 
of the socket hole.

From the custom product drawings and the locking type 
on the panels, drill the appropriate size socket hole. 
If concrete, use i.e. a diamond core drill bit with the proper 
diameter size.

Slide the proper sockets into the holes. If necessary, use 
suitable material to fix them in place. Open the unit and 
close it again and make sure the locking mechanism 
lines up with the floor socket. Please proceed with the 
next hole (one hole at a time) and repeat the process 
described above for all folding panels.  

E.

 

PANEL INSTALLATION FOR SINGLE/

DOUBLE ACTION END PANELS (NON- SLIDING

 

CENTERED AND OFFSET INCLUDING PIVOT

 

POINT AND FLOOR CLOSER INSTALLATION

Holes and slots in the floor for the pivot points and floor 
closers have to be made at exact precise spots. There is 
no second chance if the hole/slot location is off. 

See Sheet 

10-14 of the Installation Manual.

Step E1

 

Start at the bottom and use the chalk line as a reference

 

line. Measure the overall width of the panel and compare it

 

with the dimension on the custom product drawing. To

 

this dimension add 3/16

"

 (4 mm) at each end to make sure

 

the correct 3/16

"

 (4 mm) gap between the panels and

 

between the panel to the wall is maintained. 
Then the panel has to fit in the remaining opening.

Step E2

 

For the center pivot end panel (non-sliding) with pivot

 

point, the dimension for the center of the pivot axle to the

 

adjacent edge of the panel (end cap) should be 1

 

11/16

"

 (43 mm) plus the additional 3/16

"

 (4 mm) for the

 

gap to the wall. Please check custom product drawing for  

 

wing direction (inside/outside). 

See Sheet 10 of the

 

Installation Manual.

 This means a total of 1 7/

8"

 (47 mm)

 

to the edge of wall. Mark this dimension on the chalk line.

 

If concrete, use a diamond core drill bit with 1 1/4

diameter. Install the pivot point and if necessary, use

 

suitable material to fix it in place. Then install the top

 

pivot axle into the top track. Start inserting the upper

 

flush part into the top track, turn it a 1/4 counter clock

 

wise, push it up higher and turn it another 1/4 clock wise.

 

Before you fix the axle with the 2 set screws in place,

 

please use a transit/laser or other similar precise

 

measuring equipment to line up the center of the bottom

 

pivot point with the center of the top axle. 

See Sheet 11 of

 

the Installation Manual.

In preparation for the installation of this panel, take off

 

the end cap and top cover on the inside. 

 

Screw the 

adjustable bracket onto the threaded bolt of

 

the top axle 

and make sure that the set screw at the side 

 i

s lose. Now 

you can install the panel by lifting the pivot

 

axle, that is

 

installed underneath the bottom of the panel,

 

on top of

 

the bottom pivot point. Line the top axle with bracket up

 

with the shoe that is inserted into the top profile and

 

connect both parts with one another.

 

See Sheet 12 of the 

Installation Manual.

Before you finally tighten down all screws, make sure that 
all dimensions are set correct, the panel can be opened 
and closed with the right clearance and check if the 
panel is plumb and level. Then fix all screws in place and 
secure the top axle by fixing the set screw from the side. 
Afterwards put the top cover with end cap back on.

Summary of Contents for CSW75

Page 1: ...75 Folding Center Pivot Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through Nana...

Page 2: ...ckness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels The CSW75 system is shipped...

Page 3: ...anel 1 folding center pivot panel Panel 2 folding center pivot panel Panel 3 folding center pivot panel Panel 4 folding center pivot panel Panel 5 single double action end panel with pivot box or sing...

Page 4: ...taller than the total unit height depending on how level the support structure above is See Sheet 2 of the Installation Manual It is important that the opening be the correct size Product performance...

Page 5: ...nd floor sockets in concrete slabs and wood the substrate should be a minimum of 4 thick these components should be fully embedded into the concrete or wood and the clear edge distance in concrete or...

Page 6: ...ener spacing in the support structure within the opening depends on substrate material design windload pressures if exterior of project panel height and other requirements of the project All anchoring...

Page 7: ...D Step B1 Check all the carriers on all the folding panels Make sure all the locking nuts are securely tight Do not make any adjustments on the carriers yet Step B2 Before inserting the panels remove...

Page 8: ...ross the width of the opening and 23 mm 7 8 at the top If the gaps are not correct then adjust the upper track by removing or adding shims above the head track as needed The upper track has to be perf...

Page 9: ...ing with pivot point the dimension for the center of the pivot axle to the adjacent edge of the panel end cap should be 1 11 16 43 mm plus the additional 3 16 4 mm for the gap to the wall Please check...

Page 10: ...chisel out the concrete to recess the floor closer into the floor Make sure that the full underside of the box rests on a flush and level surface and fix it temporarily into place Then install the top...

Page 11: ...oint of the pivot panel use suitable material to finally fix the floor closer in place Before you put on the cover for the floor closer make sure to measure how much to cut off to make it fit with the...

Page 12: ...nt where the hinge part with hinge pin is located in your direction The panels fold together and you can push them gently from the side using both hands 4 Note that there is a carrier at each upper ce...

Page 13: ...cally check for worn or damaged components and replace as soon as possible A unit with nonworking components will subject the other components to increased stress and lead to premature failure A unit...

Page 14: ...s thickness and specifications will be needed Depending on the model widths of frameless all glass panels may not be equal Ask NanaWall for the glass dimensions Please note that glass is required to b...

Page 15: ...ance For Coastal Salt Water and Other Extreme Environments included in the Owner s Manual for each Product and is available for review on NanaWall s website is properly implemented and documented An E...

Page 16: ...ent part or product is not commercially practicable NanaWall may elect to refund the purchase price of the affected product in full satisfaction of its obligations Wood Wood components must be properl...

Page 17: ...application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Improper installation fla...

Page 18: ...tions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performance of the Product in conformance to any published NanaWall testing results e g a...

Page 19: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Reviews: