NANAWALL CSW75 OWNER’S MANUAL

14 

MAINTENANCE CHECK LIST

 

Following recommended check list of Maintenance Notes 
to be carried out on a regular basis by a maintenance 
person:

a. Clean upper track

b. Check height adjustment and setting

of each panel

c. Check if all panel end caps are in place

and fixed

d. Check if all carriages can be moved easily

e. Check if counter nuts on carriages are

adequately fastened

f. Check if hinges can be moved easily; lubricate

if necessary

g. Check if pin carriers in pivot panels are

in the right position

h. Ensure that the lower locks can be moved

easily; lubricate if necessary

i.

Check if floor sockets, pivot points and door
closers are adequately fastened to the floor

j.

Remove any dirt from the floor sockets, pivot
points and bottom door closers

k. Ensure that any lock and profile cylinder can be

moved easily

GLASS INSTALLATION AND GLAZING

 

This section applies only if you need to install glass for 
any reason. Proper glass installation is critical, as, with the 
NanaWall Folding Center Pivot Frameless System, glass is 
a structural part of the panel.

Glass, with appropriate dimensions, thickness and 
specifications will be needed. Depending on the model, 
widths of frameless all glass panels may not be equal. Ask 
NanaWall for the glass dimensions. Please note that glass 
is required to be safety glass – either fully tempered or 
laminated as specified for a particular order. Check with 
all applicable codes and regulations.

Glass shall meet the current requirements of ASTM C 
1306 “Standard Specifications for Flat Glass” for quality, 
thickness and dimensional tolerances. Tempered float 
glass shall meet the current requirements of ASTM C 
1048 “Standard Specifications for Heat-Treated Flat 
Glass - Kind HS, Kind FT Coated and Uncoated Glass.” 
All tempered glass shall have a permanent logo, which 
signifies Safety Commission 16 CFR-1201 and the safety 
glass test requirements of ANSI Z 97.1 (current editions) 
or other equivalent safety standards.

Follow all proper applicable glass installation and glazing 
techniques as recommended in the Flat Glass Marketing 
Association (FGMA) “Glazing Manual” and “Sealant 
Manual”. Always use suction cups to shift glass within an 
opening. The panels would need to be removed from the 
opening to install the glass.  Panels can be laid flat on 
sawhorses. 

Please contact NanaWall before you replace a glass 
pane in order to get the right material and instructions 
to glaze the panel!

Summary of Contents for CSW75

Page 1: ...75 Folding Center Pivot Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through Nana...

Page 2: ...ckness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels The CSW75 system is shipped...

Page 3: ...anel 1 folding center pivot panel Panel 2 folding center pivot panel Panel 3 folding center pivot panel Panel 4 folding center pivot panel Panel 5 single double action end panel with pivot box or sing...

Page 4: ...taller than the total unit height depending on how level the support structure above is See Sheet 2 of the Installation Manual It is important that the opening be the correct size Product performance...

Page 5: ...nd floor sockets in concrete slabs and wood the substrate should be a minimum of 4 thick these components should be fully embedded into the concrete or wood and the clear edge distance in concrete or...

Page 6: ...ener spacing in the support structure within the opening depends on substrate material design windload pressures if exterior of project panel height and other requirements of the project All anchoring...

Page 7: ...D Step B1 Check all the carriers on all the folding panels Make sure all the locking nuts are securely tight Do not make any adjustments on the carriers yet Step B2 Before inserting the panels remove...

Page 8: ...ross the width of the opening and 23 mm 7 8 at the top If the gaps are not correct then adjust the upper track by removing or adding shims above the head track as needed The upper track has to be perf...

Page 9: ...ing with pivot point the dimension for the center of the pivot axle to the adjacent edge of the panel end cap should be 1 11 16 43 mm plus the additional 3 16 4 mm for the gap to the wall Please check...

Page 10: ...chisel out the concrete to recess the floor closer into the floor Make sure that the full underside of the box rests on a flush and level surface and fix it temporarily into place Then install the top...

Page 11: ...oint of the pivot panel use suitable material to finally fix the floor closer in place Before you put on the cover for the floor closer make sure to measure how much to cut off to make it fit with the...

Page 12: ...nt where the hinge part with hinge pin is located in your direction The panels fold together and you can push them gently from the side using both hands 4 Note that there is a carrier at each upper ce...

Page 13: ...cally check for worn or damaged components and replace as soon as possible A unit with nonworking components will subject the other components to increased stress and lead to premature failure A unit...

Page 14: ...s thickness and specifications will be needed Depending on the model widths of frameless all glass panels may not be equal Ask NanaWall for the glass dimensions Please note that glass is required to b...

Page 15: ...ance For Coastal Salt Water and Other Extreme Environments included in the Owner s Manual for each Product and is available for review on NanaWall s website is properly implemented and documented An E...

Page 16: ...ent part or product is not commercially practicable NanaWall may elect to refund the purchase price of the affected product in full satisfaction of its obligations Wood Wood components must be properl...

Page 17: ...application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Improper installation fla...

Page 18: ...tions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performance of the Product in conformance to any published NanaWall testing results e g a...

Page 19: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Reviews: