MTUX/IA-63-00 – Installation Manual
46
Date: 2017/02/17
5.7 Standard/test connection with MDR50 central connector
5.7.1 Standard/test cabling when system is
delivered w/o COM / USB connections
Fig. 5.7.1: Central connector plug
No. in fig.
Description
1
Fast Integral GPS with central connector (to MT-VisionAir X
ETSO)
2
220 V power supply with clutch for direct connection to Fast
Integral GPS, e.g. for trial connection before installation of the
Fast Integral GPS on the aircraft or for mobile use/flight prepa
-
ration.
3
Connection cable to on-board power supply/Fast Integral GPS
installed on aircraft.
Table 5.7.1: Connections of Fast Integral GPS
5.7.2 Connection of further COM / USB devices to central connector
If further connections are desired the manufacturer provides a test cabling.
For final installation it is recommended to merge the shielded wires.
2
1
3
Summary of Contents for MT-VisionAir X ETSO
Page 10: ...MTUX IA 63 00 Installation Manual 10 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...
Page 12: ...MTUX IA 63 00 Installation Manual 12 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...
Page 28: ...MTUX IA 63 00 Installation Manual 28 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...
Page 107: ...MTUX IA 63 00 Installation Manual 107 Date 2017 02 1700 12 4 Dimensions in mm ...
Page 112: ...MTUX IA 63 00 Installation Manual 112 Date 2017 02 17 13 3 Dimensions in mm ...
Page 125: ...MTUX IA 63 00 Installation Manual 125 Date 2017 02 1700 INTENTIONALLY LEFT BLANK ...
Page 137: ...MTUX IA 63 00 Installation Manual 137 Date 2017 02 1700 ...
Page 138: ...MTUX IA 63 00 Installation Manual 138 Date 2017 02 17 ...
Page 139: ...MTUX IA 63 00 Installation Manual 139 Date 2017 02 1700 INTENTIONALLY LEFT BLANK ...
Page 146: ...MTUX IA 63 00 Installation Manual 146 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...