18
The 1st calibration point:
After specifying the number of calibration points and/or the calibration time, you can start the actual calibra-
tion.
To do so, click on the button ‘Calibration capture’ at the ‘1st calibration point’, then the window below (Figure
30) opens and calibration begins.
IMPORTANT: For the purpose of allocation of the measured raw values sampling has to take place
during the calibration process. These samples must be taken near or behind the sensor.
The 6-digit measured raw value is displayed after successful calibration. This value as seen in Figure 31 is
the calculated mean value of all raw values measured during the calibration.
The samples taken during the calibration process are now subjected to moisture determination in the labo-
ratory. The resulting values are also combined to form a mean value. The moisture value determined in the
laboratory is now manually allocated to the ‘1st calibration point’. This means the first calibration point has
been defined.
The second calibration point is determined as described under ‘The 1st calibration point’.
IMPORTANT: After every setting in the calibration screen the data must be transferred to the
Humi
Core
™
Pro
system using the ‘Program parameters and calibration’ button! Otherwise there is
a risk of losing the settings (see ‘Program parameters and calibration in Section 6.3)!
Figure 30
Figure 31