![Mocon AMETEK Dansensor MAP Check 3 Vacuum User Manual Download Page 26](http://html1.mh-extra.com/html/mocon/ametek-dansensor-map-check-3-vacuum/ametek-dansensor-map-check-3-vacuum_user-manual_1816849026.webp)
24
User Guide
EN
Dansensor
®
MAP Check 3
Vacuum
Power connector
The device’s power connector should have the following pin connections:
I/O Cable
The 25-pole communication cable between the “I/O CONTROL” connector and the
appropriate port on the packaging machine has the following pin connections:
Pins/Colours/
Function
Description
1 - White
2 - Brown
"GAS"
Gassing signal from packaging machine.
Signal levels: 10 - 32 VDC bipolar. Load: max. 10mA
Must be activated during gassing in die.
3 - Green
4 - Yellow
"EVAC"
Evacuation signal from packaging machine.
Signal levels: 10 - 32 VDC bipolar. Load: max. 10mA
Must be activated during evacuation of die.
N
Not in use
L
AC Power
DC Power
GND
13
25
12
24
11
23
10
22
9
21
8
20
7
19
6
18
5
17
4
16
3
15
2
14
1
Summary of Contents for AMETEK Dansensor MAP Check 3 Vacuum
Page 1: ...P N 320598 G 11 2019 UserGuide 7BDVVN...
Page 2: ...This blank page has been inserted to enable double sided printing of the document...
Page 4: ...2 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 8: ...6 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 12: ...10 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 20: ...18 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 54: ...52 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 76: ...74 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 84: ...82 User Guide EN Dansensor MAP Check 3 Vacuum P N 320598 G 11 2019...
Page 91: ...This blank page has been inserted to enable double sided printing of the document...