
4
5.4.2 Loading of racks during the performance of a technological program. ............... 41
5.4.3 Unloading of racks. ............................................................................................ 42
5.5 Status screen during a technological process ....................................................... 43
6. Preparing for operation .................................................................................................. 46
6.1 Switching on ............................................................................................................. 46
6.2 Check of working capacity ........................................................................................ 46
6.2.1 Positioning test. .................................................................................................. 46
7. Work sequence .............................................................................................................. 49
7.1 Before operation ....................................................................................................... 49
7.2 Switching on ............................................................................................................. 49
8 Cleaning, disinfection, and maintenance ........................................................................ 50
8.1 Cleaning and disinfection of outer surfaces and the working chamber ..................... 51
8.2 Flow-through trough and drain system ..................................................................... 51
8.3 Troughs for reagents ................................................................................................ 51
8.4 Racks ....................................................................................................................... 51
8.5 Mesh water filter ....................................................................................................... 52
8.6 Air filter ..................................................................................................................... 52
9 Troubleshooting .............................................................................................................. 53
10 Decommissioning and recycling ................................................................................... 53
11 Confirmation of performed sanitary treatment .............................................................. 54
APPENDIX A. Instruction on fire safety measures ............................................................ 55
1 General provisions ...................................................................................................... 55
2 Requirements to the room ........................................................................................... 55
3 Safety measures when handling HFL and CL ............................................................. 55
4 Actions in case of fire .................................................................................................. 56
APPENDIX B. LIST OF REAGENTS FS-9-25* ................................................................. 57
APPENDIX С. Example of developing the <DEMO> program ........................................... 58
Protocol of the <DEMO> program and its configuration ................................................. 58
Listing of the <DEMO> program and its configuration .................................................... 59
Template for developing a new technological program .................................................. 60
APPENDIX E. LIST OF ADOPTED TERMS AND ABBREVIATIONS......................... 61
APPENDIX F. «FASTAINER FIRMWARE EDITOR» PC SOFTWARE ...................... 63