background image

 

48 

8.9.8 Currency unit set (Step 7) 

Follow these steps to set the currency. Currencies that do not appear in the display can be entered 
manually. 

 

Selecting a Currency from the Display

 

[ Procedure]

 

1)  Click the Currency option button.                          

Click the option button of the currency to be used.  
 

Manually Setting the Currency

 

[Procedure]  
1)  C l i c k   “E t c . ” option button.                                    

 

To display a currency that does not exist in the 
currency display, click the “Etc.” option button.  

2)  Enter the currency unit.                                        

 

Enter the currency unit and the number of decimal 
places to use.  
*  The number  of decimal: 0~4 

 

Exit the Currency Settings.

 

[Procedure]

 

1)  Click [OK] button.                         

 

To exit the Currency Settings, click the  [ OK]  button.

 

*  If the [Cancel] button is clicked, the settings are interrupted and the screen returns to the initial 

window.  

 

8.9.9 Charge set (Step 8) 

Follow these steps to set the rate schedule for electric power fees. Select within/outside, weekend, 
and seasonal rates for this rate system. 
 

Set the electric power rate schedule. 

[Procedure]

 

1)  Select the rate schedule to be used.                      

Click the option button of the rate schedule to be 
used.  

2)  Select the unit rate and applicable time period or 

day of the week .

 

Set the unit rate, applicable time, month/day, or 
day of the week for the rate schedule. Inputting 
from the keyboard is also possible.  

3)  Click [OK] button.                          

 

When finished setting the rate schedule, click 
the  [ OK]  button.  
*  If the [Cancel] button is clicked, the settings 

are interrupted and the screen returns to the initial window.  

 
 
 
 
 
 
 
 
 
 
 
 

Note:  

•   If a required item is left blank (including 0 value), a warning message appears. Correct this item to 

proceed.  

•   Charge setting can also be performed at the Management window.  
•   Within a time (daytime) spanning one day cannot be set. Within a time (daytime) can be set once a 

day. 

•   It is possible even for proportionally divided power charges (manual input of electric amount) (*) to 

make the settlement for the “Charge ratio” of the air-conditioning charge using the charge unit cost 
calculated on this screen. Be sure to execute the charge setting.  

*  Without watt hour meter connection proportionally divided power charge function

 

Currency Unit window 

 

Rate Settings window 

Summary of Contents for TG-2000A

Page 1: ...ing Procedure 22 8 3 User Set up 23 8 4 Site Name Set up 25 8 5 G 50A Connection Set up 27 8 6 System Configuration Set up 28 8 7 Monitoring screen Set up 34 8 8 Watt Hour Meter Set up 40 8 9 Energy m...

Page 2: ...tep 4 36 8 7 6 Set up of IIon arrange and Name Step 5 37 8 7 7 Set up of Block Step6 38 8 8 Watt Hour Meter Set up 40 8 8 1 Setting Procedures and Restrictions 40 8 8 2 Watt Hour Meter Setting Step 1...

Page 3: ...soft Corporation Each company may use as registered trademarks and trade names the product names used in this manual Term description Man machine Indicates a personal computer with integrated centralz...

Page 4: ...yourself Doing the work yourself may result in improper installation which may cause electric shock or fire Do not relocate the unit yourself Relocating the unit yourself may result in incorrect insta...

Page 5: ...red A separate watt hour meter is required Billing is done with watt hour units K control type Converter required A separate watt hour meter is required Billing is done with watt hour units 1 Can be c...

Page 6: ...two types operation block and charge block The operation block is an aggregate of groups and it is possible to set a different model group for the same operation block The charge block consists of an...

Page 7: ...g watt hour meters installed at the power supply to each unit Additionally it cannot be employed in applications demanding calculations based on watt hour meters installed at each unit Thus when using...

Page 8: ...Configuration Note Be sure to use the hub Execute the LAN cascade connection as shown below For 10BASE T the cascade connection is executable up to a maximum of 4 stages For 100BASE T the cascade con...

Page 9: ...d controller Other material Floppy disk used when copying data CD R used to store generated data and copy it to the site PC Initial setting tool Personal computer in which this tool is installed LAN c...

Page 10: ...s and personal computer which uses the integrated centralized control software Check the G 50A IP address Check the IP address used for the integrated centralized control software at the same time Nor...

Page 11: ...and monitor display of the air conditioner For the operation procedure refer to the Instruction Manual Management Note For confirmation in the test operation use the checklist shown in Chapter 11 Perf...

Page 12: ...to 1024 768 or larger and the color to 65536 colors High Color 16 bit or more For details refer to the Windows users manual 7 Automatic login settings Check that the Auto log in is set 2 For the setti...

Page 13: ...the setup program 1 Starting SetupTG exe Use Windows Start Run to execute Run SetupTG exe in the Setup Step3 folder in the root directory of the Setup CD The setup start confirmation window appears R...

Page 14: ...be changed set the new location by clicking the Browse button After checking the installation location click the Next button Click the Cancel button to stop the installation 4 Installation start confi...

Page 15: ...e Manager by right clicking the MSDE icon on the taskbar 2 Stop all service To stop all service make your selection at the Service field and click the Stop button 3 End the SQL Server Service Manager...

Page 16: ...reen Cancel Invalidates the contents set on this display screen to shift to the initial screen 6 Part Names and Functions Initial window Menu bar Shows a list of functions that may be selected System...

Page 17: ...nitial window to the control window Shift the screen to the control window after completing the initial setting shown in Chapter 8 Procedure 1 Select Finish button Click the Finish button located on t...

Page 18: ...tialization password All the items in the initial window can be used The initial password is SYSTEM Maintenance password The initial window maintenance group and personal password can be changed The i...

Page 19: ...data Exit TG 2000A shut down the OS and turn the power off Select File End button Select Exit button Range described in this manual User setup group System setup group Password input Return to Initia...

Page 20: ...em structure of refrigerant system Set refrigerant connections Function of each group Set indoor unit and ventilation groups Ventilation unit grouping Set ventilators and indoor unit groupings Wizard...

Page 21: ...n the OS and turn the power off Select File End button Select Exit button Range described in this manual Maintenance setup group Control windows Management screen see separate management manual Power...

Page 22: ...e activated window Maintenance of charge data Present value monitor Data for the last 62 days from the watt hour meter indoor units and outdoor units can be viewed and edited Also current values for w...

Page 23: ...n is displayed When Windows OS restarts the integrated software TG 2000A application starts automatically After the startup screen is displayed the behavior of the application depends on the existence...

Page 24: ...click the OK button to exit the application Click the Cancel button to return to the Initial window Shutting down the OS Shut down the OS Windows 2000 XP after verifying that the TG 2000A application...

Page 25: ...group Remedial apportioning setting Remedial apportioning can be tentatively performed when charging trouble occurs Displays the operation contents of the select buttons on each setting screen Buttons...

Page 26: ...ign Off Deactivate Do not automaticaly display On Activate Automaticaly display Default Note If the settings are done out of order some items will not be available and others will have to be set again...

Page 27: ...et the output folder When database backup was set to On set the database folder to be backed up using the Browse button The initial value is C TG2000 databackup Set the folder to be backed up to an HD...

Page 28: ...onditioning charges for regular hours and off hours also Watt hour meter connection Non connection Charge calculation function without WHM connected default Connection Charge calculation function with...

Page 29: ...eyboard 3 Click the OK button When finished entering the site name click the OK button Click the Cancel button the site name is left unchanged Note Site names may contain a maximum of 20 characters Th...

Page 30: ...s setting is terminated to return to the initial screen Set the G 50A connection in accordance with the following procedure Step 1 Number of G 50 set up Step 2 IP address of G 50 set up 8 5 2 Number o...

Page 31: ...n set up button Click the System configuration set up button located in the system setting group on the initial window 2 Select the OK button after confirming the display contents Check the contents o...

Page 32: ...irm the unit configuration Procedure 1 Select the G 50 No with the buttons In this case use the buttons to select the G 50A No desired to confirm the unit configuration 2 Select the OK button after ch...

Page 33: ...ave OS Subsidiary outdoor unit 51 to 100 RC ME remote controller compact remote controller LOSSNAY remote controller 101 to 200 SC System controller Including GR SR and AN GR Group remote controller S...

Page 34: ...elect the OK button After fully completing the refrigerant system information changes click the OK button The information possessed by the integrated software is compared with the G 50A refrigerant in...

Page 35: ...fter fully completing the group information changes click the OK button This group setting screen displays the number of groups and number of indoor units which allow the GR SR AN and SC to be newly o...

Page 36: ...cked this setting is terminated to return to the initial window Change the ventilation unit interlocking set up information Procedure 1 Select the No of G 50 with button In this case select the No of...

Page 37: ...7 2 Set up of model name Step 1 Set the model name of the air conditioner unit outdoor unit indoor unit sub unit LOSSNAY etc connected to this system Setup the unit configuration model name Procedure...

Page 38: ...initial window 8 7 3 Set up of the number of floors and floor name Step 2 Follow these steps to set the number of floors being managed floor count and floor names Set the number of floors and floor na...

Page 39: ...the Change button The paint brush starts up and the floor plane can be edited 7 Create a floor plane Use the paint brush to edit the floor plane of the selected floor 8 Exit the paint brush Click the...

Page 40: ...rned to the group list Group name change Click the Name change button which displays the group name change screen Change the group name on the screen to the desired name Icon movement Click the Move b...

Page 41: ...on each floor 8 Click OK button When finished setting blocks click the OK button When the Cancel button is clicked this setting is terminated to return to the initial window Deleting block settings F...

Page 42: ...the name of the block to change The selected block appears in the selected block cell 3 Enter a new name Enter the new block name Subsequently enter the other new block names 2 to 3 4 Click OK button...

Page 43: ...umber of watt hour meters to be used and their address 4 Set the serial No Input the serial No for Model AEM31D 485 only Example When S N 70 87948 set 87948 5 Select OK button When finished making cha...

Page 44: ...rameters that must be set at the watt hour meter used Name and maximum integrated value settings Note A name and location up to 16 characters long can be entered Always set the WHM maximum integrated...

Page 45: ...ttings be sure to compile charge information up to the previous day and print it out or have the results in hand before making changes to the settings If charge information is not processed the charge...

Page 46: ...mode for indoor unit Select the division mode for indoor unit electric amount used primarily FAN Do not Do not division the power consumption of indoor units Do Use the formula cumulative indoor unit...

Page 47: ...utdoor unit crank case heater capacity Procedure 1 Select the G 50 number using the button Using the button select the G 50A number assigned to the outdoor unit whose crank case heater capacity is to...

Page 48: ...ationship between that unit and the watt hour meter is deleted Note Outdoor units connected to a watt hour meter are light blue When a set outdoor unit Model Name applies to a database its crank case...

Page 49: ...heck that The same as that of the block for operation is selected and proceed to step 6 The same as that of the block for operation The charging block is the same as the operation block Create separat...

Page 50: ...t to delete The block is selected Blue display 2 Click Delete Block button When the Delete Block button is clicked the block settings are deleted and the block returns to the Block No Name column Rele...

Page 51: ...te schedule Procedure 1 Select the rate schedule to be used Click the option button of the rate schedule to be used 2 Select the unit rate and applicable time period or day of the week Set the unit ra...

Page 52: ...charge by block or watt hour meter The standard fixed charge for watt hour meters can only be set on those units billed by the watt hour meter 2 Click Finish button When finished with these settings...

Page 53: ...inated to return to the initial screen Precautions for using this function For this system the G 50A main unit collects the operation data of the air conditioner from the indoor unit to which the G 50...

Page 54: ...applies when the charge function is on Because charge collection processing is performed When the current time is between 04 00 and 07 00 We recommend that the time be checked and corrected once a mon...

Page 55: ...er the password for verification When a new password was set at Step 2 set the same password for verification 5 Click OK button after finishing the setting Check the display contents and click the OK...

Page 56: ...aintenance screen It is unnecessary to perform this procedure when there is an agreement that allows the charge to be collected even if the forwarded settlement occurs Table Assumed cases and recovery...

Page 57: ...he total ofair conditioning charge for the interval to be apportioned Then the air conditioning charge is calculated and the normal interval air conditioning charge Use un apportioning generated by th...

Page 58: ...nd 2 above At the end of the preparations above perform charging data maintenance 9 2 2Maintenance Methods and Restrictions Follow these steps to display the Charge Data Mainte nance screen Display th...

Page 59: ...ary heater operation time for regular hours and off hours Maintaining Apportioned Unit Data Procedure 1 Select the selection method Click the Select from G 50 or Select from charging block check box i...

Page 60: ...the results of the air conditioning block charge calculated in accordance with the corrected data is displayed together with the pre correction total proportional division parameter It can be used as...

Page 61: ...Use of normal period only Use the proportional division parameter only for the normal period but not the proportional division parameter for the number of all indoor units used during the failure peri...

Page 62: ...hanged regular hours off hours The cursor appears in that cell 3 Make changes to the data Enter the changes to the data for each time slot 4 Repeat steps 1 to 3 Repeat these steps to make changes to t...

Page 63: ...t is correct however as the forwarded calculation is executed after the repair on the next day or at a later time but the calculation result is displayed in red as an error red Because of the reasons...

Page 64: ...save ratio of indoor unit integrated FAN operation time integrated thermo ON time integrated subsidiary heater operation time and charge parameters to the file Note The value stored in PC of TG 2000A...

Page 65: ...he output destination and file name click the Output button The file is saved After finishing this screen closes Click the Cancel button to return to the Initial window Output file data format The dat...

Page 66: ...do it before remedial apportioning This function cannot be used for Without WHM connection proportionally divided electric charge Assumed case Item att hour meter failure Monitoring impossible HDD fai...

Page 67: ...he buttons to set the remedial interval dates 6 Set the power integrated value Displays the power integrated value at 00 00 hours of the remedial apportioning start day The integrated value at 24 00 h...

Page 68: ...standard charge can be selected only when the settlement of accounts term is 1 month Set the power integrated value only when necessary The power integrated value initial value is the value stored in...

Page 69: ...the setup method and install 3 System configuration and charging system restoration Recover the system information by resetting the air conditioning system configuration charging system etc 4 Run the...

Page 70: ...setting of the remedial apportioning screen is complete perform section 9 5 2 3 Calculate remedial apportioning 9 5 4Remedy when personal computer HDD fails backup The following describes the remedy...

Page 71: ...val The remedial start day is the backup day and the remedial end day is the recovery day Note Operation amount data backup monitoring for the failure day is also possible Since the operation amount d...

Page 72: ...g screen The initial value is the settlement of accounts term of the previous month 5 Total air conditioning charge setting Set the settlement of accounts term total air conditioning charge Note Recov...

Page 73: ...ttle of accounts day 3 Start remedial apportioning Start remedial apportioning by clicking the Remedial apportioning icon in the initial window This is described by the time series example below Note...

Page 74: ...he electric power consumption for the remedial interval Examples 1 and 2 study the power consumption for the three days from the failure day 00 00 to the day after recovery 00 00 and calculate the pow...

Page 75: ...from the normal settlement of accounts term Remedial apportioning can begin two days after the recovery day Only when the day after the recovery day was normally charged Maintenance tip Before system...

Page 76: ...er to the indoor unit operation amount and calculate and study the remedial interval power consumption for each watt hour meter Only the watt hour meters where the watt hour meter and unit wiring conn...

Page 77: ...ture abnormality allowance Common operand 23 Water system pressure abnormality Common operand 24 Water system pressure abnormality allowance Common operand 2500 Water system not operate due to water l...

Page 78: ...radiating thermostat abnormality Inverter No 4240 Inverter overcurrent overload protection 424 Inverter overcurrent protection Inverter No 4250 Inverter IPM bus voltage abnormality 425 Inverter IPM a...

Page 79: ...ty 6772 K abnormality Inner thermostat function Discharge temperature abnormality Shell thermostat function Overcurrent protection 6773 K abnormality Radiator plate thermostat function 6774 K abnormal...

Page 80: ...ipment unsettled 7130 System abnormality Different unit model error 7200 System abnormality Numeric values unsettled 7201 System abnormality Numeric values unsettled 2 System error codes The following...

Page 81: ...Indoor unit groups V V V V System configura tion settings Set indoor units and ventilation functions V V V V Setup of unit model name V V V V Set t he number of floors and floor name V V V V Create f...

Page 82: ...oup block floor and entire building If operation from the man machine operated the wrong air conditioner check the following settings Position and name of group icon setting See section 8 7 6 Indoor u...

Page 83: ...p units M M on off block units Floor G 50A IP address Unit address Unit model Group address Group name Block name Start up check error display LRC display G 50A display AC status LRC display G 50A dis...

Page 84: ...n off Entire building Local remote controller on off Central controller G 50A on off M M display M M display LRC display G 50A display AC status LRC display G 50A display AC status Floor Block Entire...

Page 85: ...setting See section 8 9 9 Set the time using the with within outside setting to perform the charging test run check Same unit cost for the With daytime nighttime setting Without weekend charge settin...

Page 86: ...ss than the operation time by minute of the air conditioner When the decision check is NG check the following contents to restore the necessary conditions Charge calculation block setting block settin...

Page 87: ...election Charge setting Settlement date setting Indoor unit setting contents Check Name of managed equipment Floor G 50A IP address Unit address Group address Charge block name Indoor unit performance...

Page 88: ...rge calculation parameters Operation check Within Outside Check Within Outside Check MEMO Total Setting details check after test operation Division mode setting Charge setting Charge unit used top wit...

Page 89: ...oses set it to the next day Charge block setting See section 8 9 7 Set the charge block to be manipulated To set the charge block operation block must be set See section 8 7 7 Check the following deta...

Page 90: ...utside is not 0 If the electric amount within outside is not 0 then that is deemed OK If the electric amount is 0 check the following details and rectify the problem Check if the meter value of the wa...

Page 91: ...xchange unit is deemed OK When the difference exceeds number of blocks minimum exchange unit then check the following settings and rectify the problem Charge block setting block setting Standard charg...

Page 92: ...ent Floor G 50A IP address Unit address Group address Block name Indoor unit performance Fan capacity Indoor unit WHM No Outdoor unit WHM No Outdoor unit address Crank case heater capacity Check resul...

Page 93: ...ts Division electric amount Operat ion check Within Outside Check MEMO Total Setting details check after test operation Division mode setting Charge setting Charge unit used top within bottom outside...

Page 94: ...s ESC In this case select Fresh copy and press the ESC key 5 Select the type of keyboard If a Japanese keyboard is used press the Single byte double byte key 6 With the above step the keyboard confirm...

Page 95: ...king Settings screen is skipped and Setup advances to Step 23 Typical Setting or Custom Setting can be selected Select Custom Setting and click Next 19 The Networking Components screen appears Set the...

Page 96: ...t checked If it is checked remove the check It is necessary to select the user name Administrator and then to input the user name and password Click the Application button and the Auto log on setting...

Page 97: ...tion parameter by multiplying the fault period number of days using the average value for one week before the fault as the charge calculation parameter for a day and input it as the charge calculation...

Page 98: ...WT03901X01 HEAD OFFICE MITSUBISHI DENKI BLDG 2 2 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN...

Reviews: