11.1 Setting Check List
Follow a setting item check list according to each function you want to use.
Detail of function
Case 1
Manage groups by address
Case 2
Manage groups and blocks by name (shown by floor plan)
Case 3
Case 2 + Manage scheduling
Case 4
Case 3 + Manage air conditioner charging
Check the following items for the above cases.
Setting item
Case 1
Case 2
Case 3
Case 4
User settings
V
V
V
V
Site name settings
V
V
V
V
Set number of G-50A
V
V
V
V
G-50A
connection
setting
Set G-50A IP address
V
V
V
V
Configure unit
V
V
V
V
Set cooling system
V
V
V
V
Set the Indoor unit groups
V
V
V
V
System
configura-
tion settings
Set indoor units and ventilation
functions
V
V
V
V
Setup of unit model name
V
V
V
V
Set t he number of floors and floor
name
V
V
V
V
Create floor planes
V
V
V
V
Set the floors and G-50A units
V
V
V
V
Position and name group icons
V
V
V
V
Monitoring
setting
Set blocks
V
V
V
V
Time settings
V
V
V
V
Password change
V
V
V
V
Setting schedule (Year/Wee k )
V
V
Setting charge system
V
WHM setting *1
V
Check initial settings of charge
system setting
V
Option
*1: In charge collection without WHM connection, a setup is unnecessary.
11.Setting Check List
Note:
• To use the optional annual/weekly schedule and charge (calculation) function, it is necessary
to register the license No. to the G-50A .
• Change the password as required.