4 PROCEDURES BEFORE OPERATION
25
4
4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting modules
Mount the temperature control module in a desired configuration.
2.
Wiring
Wire external devices to the temperature control module.
Page 29 INSTALLATION AND WIRING
3.
Addition of modules
Use an engineering tool to add the temperature control module to the module configuration. For details, refer to the following.
GX Works3 Operating Manual
4.
Setting parameters
Use an engineering tool to set the parameters of the temperature control module. For details, refer to the following.
MELSEC iQ-R Temperature Control Module User's Manual (Application)
5.
Execution of auto tuning
To execute the auto tuning, set PID constants with the auto tuning function. For details, refer to the following.
MELSEC iQ-R Temperature Control Module User's Manual (Application)
Perform a warm-up operation for about 15 minutes before executing the auto tuning.
6.
Programming
Create a program. For details, refer to the following.
7.
Warm-up operation
Perform a warm-up operation for about 15 minutes before operation.
To prevent operations of the temperature control module from being affected by the temperature rise inside
the module just after the power-on, perform a warm-up operation for about 15 minutes before the auto tuning
or the operation.
Summary of Contents for MELSEC iQ-R series
Page 2: ......
Page 13: ...11 MEMO ...
Page 15: ...13 CONTENTS TRADEMARKS 82 ...
Page 19: ...1 PART NAMES 17 1 MEMO ...
Page 28: ...26 4 PROCEDURES BEFORE OPERATION MEMO ...
Page 52: ...50 6 INSTALLATION AND WIRING 6 5 Unused Channel Setting MEMO ...
Page 79: ...APPENDIX Appendix 1 External Dimensions 77 A MEMO ...
Page 81: ...I 79 MEMO ...
Page 85: ......