6 INSTALLATION AND WIRING
6.1 Terminal Block
33
6
■
R60TCRT4 and R60TCRT4BW (Terminal block for I/O)
• Standard control, heating-cooling control (normal mode), mix control (normal mode), and position proportional control
(normal mode)
Terminal
No.
Standard control
Heating-cooling control
(normal mode)
Mix control (normal mode)
Position proportional
control (normal mode)
Symbol Name
Symbol Name
Symbol Name
Symbol Name
1
L1
CH1 Output
L1H
CH1 Heating output
L1H
CH1 Heating output
CH1
OPEN
CH1 Open output
2
L2
CH2 Output
L1C
CH1 Cooling output
L1C
CH1 Cooling output
CH1
CLOSE
CH1 Close output
3
L3
CH3 Output
L2H
CH2 Heating output
L3
CH3 Output
CH2
OPEN
CH2 Open output
4
L4
CH4 Output
L2C
CH2 Cooling output
L4
CH4 Output
CH2
CLOSE
CH2 Close output
5
COM-
Output common
COM-
Output common
COM-
Output common
COM-
Output common
6
NC
Not used
NC
Not used
NC
Not used
NC
Not used
7
CH1A
CH1 Resistance
thermometer A
CH1A
CH1 Resistance
thermometer A
CH1A
CH1 Resistance
thermometer A
CH1A
CH1 Resistance
thermometer A
8
CH2A
CH2 Resistance
thermometer A
CH2A
CH2 Resistance
thermometer A
MT2A
Monitor 2 resistance
thermometer A
CH2A
CH2 Resistance
thermometer A
9
CH1B
CH1 Resistance
thermometer B
CH1B
CH1 Resistance
thermometer B
CH1B
CH1 Resistance
thermometer B
CH1B
CH1 Resistance
thermometer B
10
CH2B
CH2 Resistance
thermometer B
CH2B
CH2 Resistance
thermometer B
MT2B
Monitor 2 resistance
thermometer B
CH2B
CH2 Resistance
thermometer B
11
CH1b
CH1 Resistance
thermometer b
CH1b
CH1 Resistance
thermometer b
CH1b
CH1 Resistance
thermometer b
CH1b
CH1 Resistance
thermometer b
12
CH2b
CH2 Resistance
thermometer b
CH2b
CH2 Resistance
thermometer b
MT2b
Monitor 2 resistance
thermometer b
CH2b
CH2 Resistance
thermometer b
13
CH3A
CH3 Resistance
thermometer A
MT3A
Monitor 3 resistance
thermometer A
CH3A
CH3 Resistance
thermometer A
MT3A
Monitor 3 resistance
thermometer A
14
CH4A
CH4 Resistance
thermometer A
MT4A
Monitor 4 resistance
thermometer A
CH4A
CH4 Resistance
thermometer A
MT4A
Monitor 4 resistance
thermometer A
Summary of Contents for MELSEC iQ-R series
Page 2: ......
Page 13: ...11 MEMO ...
Page 15: ...13 CONTENTS TRADEMARKS 82 ...
Page 19: ...1 PART NAMES 17 1 MEMO ...
Page 28: ...26 4 PROCEDURES BEFORE OPERATION MEMO ...
Page 52: ...50 6 INSTALLATION AND WIRING 6 5 Unused Channel Setting MEMO ...
Page 79: ...APPENDIX Appendix 1 External Dimensions 77 A MEMO ...
Page 81: ...I 79 MEMO ...
Page 85: ......