10
INTRODUCTION
Thank you for purchasing the Mitsubishi MELSEC iQ-R series programmable controllers.
This manual describes the performance specifications, procedures before operation, wiring, and operation examples of the
relevant products listed below.
Before using this product, please read this manual and the relevant manuals carefully and develop familiarity with the
functions and performance of the MELSEC iQ-R series programmable controller to handle the product correctly.
When applying the program and circuit examples provided in this manual to an actual system, ensure the applicability and
confirm that it will not cause system control problems.
Please make sure that the end users read this manual.
Unless otherwise specified, this manual provides program examples in which the I/O numbers of X/Y0 to X/YF
are assigned to the temperature control module. Assign I/O numbers when applying the program examples to
an actual system. For I/O number assignment, refer to the following.
MELSEC iQ-R Module Configuration Manual
Relevant products
R60TCTRT2TT2, R60TCTRT2TT2BW, R60TCRT4, R60TCRT4BW
COMPLIANCE WITH EMC AND LOW VOLTAGE
DIRECTIVES
Method of ensuring compliance
To ensure that Mitsubishi programmable controllers maintain EMC and Low Voltage Directives when incorporated into other
machinery or equipment, certain measures may be necessary. Please refer to one of the following manuals.
•
MELSEC iQ-R Module Configuration Manual
•
Safety Guidelines (This manual is included with the base unit.)
The CE mark on the side of the programmable controller indicates compliance with EMC and Low Voltage Directives.
Additional measures
To ensure that this product maintains EMC and Low Voltage Directives, please refer to one of the following manuals.
•
MELSEC iQ-R Module Configuration Manual
•
Safety Guidelines (This manual is included with the base unit.)
Summary of Contents for MELSEC iQ-R series
Page 2: ......
Page 13: ...11 MEMO ...
Page 15: ...13 CONTENTS TRADEMARKS 82 ...
Page 19: ...1 PART NAMES 17 1 MEMO ...
Page 28: ...26 4 PROCEDURES BEFORE OPERATION MEMO ...
Page 52: ...50 6 INSTALLATION AND WIRING 6 5 Unused Channel Setting MEMO ...
Page 79: ...APPENDIX Appendix 1 External Dimensions 77 A MEMO ...
Page 81: ...I 79 MEMO ...
Page 85: ......