15
OCH771
Service Ref.
Piping length (one way)
Initial
charged
10 m 20 m 30 m 40 m 50 m 55 m 60 m 70 m
75 m
100 m
PUZ-ZM60VHA2(-ET/-ER).UK
2.8
2.8
2.8
3.2
3.6
3.6
—
—
—
—
2.8
PUZ-ZM71VHA2(-ET/-ER).UK
2.8
2.8
2.8
3.2
3.6
3.6
—
—
—
—
2.8
PUZ-ZM100VKA2(-ET/-ER).UK
PUZ-ZM100YKA2.(-ET/-ER).UK
3.1
3.3
3.5
3.6
4.0
4.2
4.4
4.8
5.0
6.0
3.6
PUZ-ZM125VKA2(-ET/-ER).UK
PUZ-ZM125YKA2(-ET/-ER).UK
3.1
3.3
3.5
3.6
4.0
4.2
4.4
4.8
5.0
6.0
3.6
PUZ-ZM140VKA2.(-ET/-ER).UK
PUZ-ZM140YKA2(-ET/-ER).UK
3.1
3.3
3.5
3.6
4.0
4.2
4.4
4.8
5.0
6.0
3.6
PUZ-ZM200YKA2.UK
5.7
6.0
6.3
6.7
7.1
7.3
7.5
7.9
"Calculate the amount
of additional refrigerant
charge using formula
provided below"
6.3
PUZ-ZM250YKA2.UK
6.2
6.8
6.8
7.4
8.0
8.3
8.6
9.2
6.8
5
DATA
5-1. REFILLING REFRIGERANT CHARGE (R32: kg)
Additional charge is required
for pipes longer than 40m
(ZM100/125/140)
5-2. COMPRESSOR TECHNICAL DATA
(Winding temperature at 20°C)
Service Ref.
PUZ-ZM60VHA2(-ET/-ER).UK
PUZ-ZM71VHA2(-ET/-ER).UK
PUZ-ZM100VKA2(-ET/-ER).UK
PUZ-ZM125VKA2(-ET/-ER).UK
PUZ-ZM140VKA2(-ET/-ER).UK
Compressor model
SVB172FFUM1
DVB28FCGMT
DVB36FCHMT
Winding Resistance
(Ω)
U-V
1.160
0.480
0.320
U-W
1.160
0.480
0.320
W-V
1.160
0.480
0.320
Service Ref.
PUZ-ZM100YKA2(-ET/-ER).UK
PUZ-ZM125YKA2(-ET/-ER).UK
PUZ-ZM140YKA2(-ET/-ER).UK
PUZ-ZM200YKA2.UK
PUZ-ZM250YKA2.UK
Compressor model
DVB28FCJMT
DVB36FCKMT
AVB52FBAMT
Winding Resistance
(Ω)
U-V
1.240
0.750
0.305
U-W
1.240
0.750
0.305
W-V
1.240
0.750
0.305
Main piping:
Liquid line size
ø9.52 overall length
[m]
o
0.04 (Gas line: ø25.4)
Branch piping:
Liquid line size
ø9.52 overall length
o
0.03 (Gas line: ø15.88)
Branch piping:
Liquid line size
ø6.35 overall length
o
0.01
Amount of additional
charge
Main piping:
Liquid line size
ø12.7 overall length
o
0.06
=
Maximum additional
charge
ZM200
2.9 kg
ZM250
2.4 kg
Additional charge amount
for 70 m
ZM200
1.6 kg
ZM250
2.4 kg
+
+
+
–
When the total length of the piping exceeds 70 m, calculate the amount of additional charge based on the following requirements.
Note: If the calculation produces a negative number (i.e. a “minus” charge), of if calculation results in an amount that is less than the “Additional charge
amount for 70”, perform the additional charge using the amount shown in “Additional charge amount for 70 m”.
[kg]
[m]
o
0.06 [kg/m]
[m]
o
0.04 [kg/m]
[m]
o
0.03 [kg/m]
[m]
o
0.01 [kg/m]
ZM200
1.2 kg
ZM250
1.8 kg
Additional charge is required
for pipes longer than 30m
(ZM60/71/200/250)
Summary of Contents for PUZ-ZM60VHA2
Page 23: ...23 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 7 WIRING DIAGRAM ...
Page 24: ...24 OCH771 PUZ ZM100VKA2 ET ER UK ...
Page 25: ...25 OCH771 PUZ ZM125VKA2 ET ER UK PUZ ZM140VKA2 ET ER UK ...
Page 26: ...26 OCH771 PUZ ZM100YKA2 ET ER UK PUZ ZM125YKA2 ET ER UK PUZ ZM140YKA2 ET ER UK ...