102
OPERATING PROCEDURE
PHOTOS
Photo 5
Drain hose
Screws of
the vane
motor
Vane motor
Conduit cover
Screws of the
conduit plate
Photo 3
Photo 4
3. Removing the electrical box
(1) Remove the front panel. (Refer to 1)
(2) Remove the electrical cover. (Refer to 2)
(3) Disconnect the connector of the indoor coil
thermistor(CN112).
(4) Disconnect the motor connector (CN211 and CN121) and
the vane motor connector (CN151) on the electronic
control P.C. board.
(5) Remove the screw of ground wire.
(6) Remove the fan motor lead wire and indoor coil thermistor
lead wire from the electrical box.
(7) Remove the lead wire of vane motor from the bottom of
electrical box.
(8) Remove the R.L holder.
(9) Remove the screw of the conduit cover.
(10) Pull down the conduit cover and remove it.
(11) Remove the screw of the conduit plate and remove the
conduit plate.
(12) Remove the screw fixing the electrical box, remove the
electrical box.
4. Removing the vane motor
(1) Remove the front panel. (Refer to 1)
(2) Remove the electrical box. (Refer to 3)
(3) Pull out the drain hose from the nozzle assembly, remove
the nozzle assembly.
(4) Remove the screws (both upper and lower) of the vane
motor, disconnect the connector.
(5) Remove the vane motor.
Screw of the ground wire
Screw fixing the
electrical box
OB275--4.qxp 03.12.2 5:22 PM Page 102
Summary of Contents for MSH09TW
Page 127: ......