background image

 

 

43 

12.  Troubleshooting 

 

If the product gives off abnormal noise, smell, smoke or heat, turn the power off immediately. 
Check the following items for troubleshooting. 

 

Symptom 

Check item 

The POWER lamp on the 
power supply section does 
not turn on. 

 Is the power supply (100 to 240 V AC, 50/60 Hz) properly connected between L 

and N on the terminal block of the power supply section? 

 Is there any short-circuit or break in the power line? 

The "ERR." LED on the 
CC-Link communication 
section is lighting or blinking. 

Is there any error in communication with CC-Link terminal devices? Check 
whether CC-Link terminal devices, CC-Link station numbers and CC-Link baud 
rate are properly configured and communication cables and termination resistors 
are properly connected. 

The "ERR." LED on the 
server section is lighting. 

 The battery is at the end of its life. Replace the battery.   

(See 6.2 Replacing the battery.) 

 Is the battery connected? 

The "STA." LED on the 
server section is blinking for 
a long time. 

The data in the memory card is being restored during startup. The product starts 
up normally after a few minutes. 

"E0" is displayed on the 
7-segment LED on the 
server section. 

AC100 to 240V (+10%,-15%) 50/60Hz is not connected to V1,V2 in demand 
terminal block. It is possible to take the power from the power supply section. 

"E1" is displayed on the 
7-segment LED on the 
server section. 

Access to the internal memory has failed. 
Reset the product. 

"E2" is displayed on the 
7-segment LED on the 
server section. 

Access to the CompactFlash memory card has failed. 
Reset the product. 

"E3" is displayed on the 
7-segment LED on the 
server section. 

Automatic time adjustment with the SNTP server has failed. 
Check whether normal communication can be established with the SNTP server 
or settings in the SNTP server are correct. 

"E4" is displayed on the 
7-segment LED on the 
server section. 

File transfer to the FTP server has failed. 
Check whether normal communication can be established with the FTP server or 
settings in the FTP server are correct. 

The indication rotates on the 
7-segment LED on the 
server section. 

Is any CompactFlash card other than that supplied with the product connected? 
Only the supplied CompactFlash card can be used. Connect the supplied card. 
Please compare CompactFlash and   
the right side of main product by the   
sheet in the right. 
 

If you cannot solve your trouble in accordance with the check items above, contact your supplier or us. 
 
 

 

 

Summary of Contents for MES3-255C-DM-EN

Page 1: ...bServerIII MODEL MES3 255C DM EN User s Manual Hardware Before operating the instrument you should first read thoroughly this operation manual for safe operation and optimized performance of the product Deliver this user s manual to the end user ...

Page 2: ...ser s Manual Operating IB63918 Packing materials and instruction manual To reduce the load on the environment Packing materials use corrugated cardboard The instruction manual uses recycled paper Packaged items Open the package and make sure all the following items are included Item Qty Item Qty Energy Saving Data Collecting Server main unit 1 Black 110 Ω 1 2 W White 130 Ω 1 2 W CC Link terminatio...

Page 3: ...24 7 IP Address Setting 25 7 1 Setting an IP address 25 7 2 Checking the IP address 30 7 3 Time limit synchronization of the demand surveillance section 30 8 Connection Diagram 31 8 1 Power supply section Section de l alimentation électrique 31 8 2 Ethernet communication section CH1 for connection to PC Section de communication Ethernet 32 8 2 1 For initial setting IP address setting Pour les régl...

Page 4: ...n inappropriate solderless terminal is used wire breakage or contact failure may occur resulting in the device malfunction failure burnout or fire To comply with the UL c UL standard use wires whose temperature rating is 60 ºC 75 ºC for copper conductors Pour UL c UL standard utilisez le conduit en cuivre dont la température classée à 60 ºC 75 ºC Part Wire size Appropriate solderless terminal Powe...

Page 5: ...istance All power lines More than 100mm Other signal line auxiliary power line power frequency input line Condition Distance Power line of 600V or less More than 300mm Other power lines More than 600mm Please connect the shield wire of the CC Link communication cable to the SLD terminal of each of the CC Link communication terminals And SLD of each terminal FG are connected inside the unit To prev...

Page 6: ...4 No looseness with installation and terminal block wiring Check this under de energized conditions Please replace the battery when a voltage drop occurred BAT LED on server section is red lighting or every 3 years Cautions Checking for looseness with installation terminal block wiring and connector connection must be done under de energized conditions When a power failure is occurred in a voltage...

Page 7: ...ecautions Avoid using simple string like Name birth date and numbers Set the complex loging ID and password at least 8 characters by mixing uppercase or lowercase alphanumeric characters QR code attached on the product The QR code attached on the product is intended for the management of product manufacturing and should not be used by the customer Reading of the QR code using commercially availabl...

Page 8: ... the specific consumption planned value or the energy planned value is reached or when a measuring point turns on or off Abnormal states can be quickly detected by sounding buzzers and turning on lamps With just a simple setup the collected data can be sent to the devices in programmable logic controllers enabling easy coordination with the equipment control Installing a mail server SMTP server or...

Page 9: ...II Time adjustment Client PC Output the alarm status data upper lower limit over and operation status etc to a lamp or buzzer GOT 空調 コントローラ PLC PLC PLC FTP Server SMTP Server SNTP Server EMU3 Series MDU braker Electronic multi measuring instrument Contact input Analog input Temperature input MELSEC Q energy measuring module via CC Link local station File server Mail server Time server Air controll...

Page 10: ...ct external devices such as buzzers or lamps CC Link Station number setup switch CC Link Transmission speed setup switch LED indications Indicates the statuses of the product LAN interface CH2 Used to connect programmable logic controllers GOT or MODBUS terminal CC Link terminal block Connect a CC Link communication cable LAN interface CH1 Used to connect a PC USB interface Unused LED indications ...

Page 11: ... this card It is also used to save collected data 3 2 Connect a power supply of 100 240 V AC 10 15 50 60 Hz Do not connect any power supply other than the above otherwise it may cause malfunction 3 The memory card should stay inserted in the product all the time Removing it while the power is on or the card is being accessed may cause the product to malfunction Before removing the card from the me...

Page 12: ...nk communication section is in an abnormal condition MST CC Link master Turns green During normal operation This LED remains green all the time because the product is fixed in CC Link master mode during operation SD CC Link communication status Blinks green In the process of transmitting through CC Link communication RD Blinks green In the process of receiving through CC Link communication L RUN C...

Page 13: ...s being inputted or the time limit synchronization switch is being pressed Turns off Other than the above DS Starting status of demand time limit or status of demand time limit Turns green for 2 seconds When the demand time limit starts or the pressing of the time limit synchronization switch is detected Turns green At the time of occurrence of an outside time limit synchronism error Blinks green ...

Page 14: ...bol Function ERR ERR terminal Unused FG FG terminal ground terminal LG LG terminal Grounded through the power filter N Auxiliary power input Input ratings Power supply 100 to 240 V AC L Terminal block CC Link communication section Terminal symbol Function DA CC Link communication line A DB CC Link communication line B DG CC Link communication line ground SLD CC Link communication line shield NC Un...

Page 15: ...AT SW battery switch demand surveillance section When the demand function is used turn on this switch to maintain the clock setting even if the product is powered off Factory default of BAT SW is OFF Please turn it on before demand monitoring TS time limit synchronization switch demand surveillance section Use this switch to synchronize the time limit Synchronize the time limit means time adjustme...

Page 16: ...tallation of the software in User s Manual Setting 2 Use the configuration software to set an IP address for the product See 7 IP Address Setting If you use the factory default setting IP address 192 168 10 1 you do not have to perform this step 3 Use the configuration software to set a year month day and clock for the product See Chapter 4 Operating Procedures 4 8 1 Time Settings in Instruction M...

Page 17: ...s small 2 and large 1 on the back of the main unit Montez adaptateurs pour monter sur IEC rail petits 2 et grand 1 sur le dos de l unité principale Place the hook of the adaptor small into the lower hole Placez le crochet de l adaptateur petit dans le trou plus bas Push the upper part of the adaptor small until you hear it click Appuyez supérieur de l adaptateur petit jusqu à vous l entendez claqu...

Page 18: ...l View A Vue A View A Vue A Mounting screw Borne de montage Square washer Rondelle carrée Installation side panel etc Côté d installation planche etc IEC rail IEC rail Keep 80 to 90 mm between the square washers Maintenez de 80 à 90 mm entre des rondelle carrées 80 to 90 mm IEC rail mounting square washer Rondelle carrée pour fixer IEC rail IEC rail IEC rail 35 mm Make sure to place the square was...

Page 19: ...ct using the IEC rail stoppers 1 Loosen the screw on the top of the stopper Desserrez le vis au sommet de ferrure en métal de fixation Stopper Ferrure en métal de fixation Hook Crochet Hook Crochet 2 Hitch the lower hook of the stopper to the bottom of the IEC rail Placez le crochet inférieur de ferrure en métal de fixation en bas de l IEC rail 3 Hitch the upper hook of the stopper to the top of t...

Page 20: ...s à l IEC rail 6 Check that both right and left stoppers are secured to the IEC rail Vérifiez que la ferrures en métal de fixation en droite et gauche sont fermement attachées à l IEC rail Stopper Ferrure en métal de fixation Stopper Ferrure en métal de fixation Suivez de 1 à 3 1 Fixer le DIN rail 2 Mettre la ferrure en métal de fixation à l unité principale 3 Desserre la ferrure en métal de fixat...

Page 21: ...boutonnez les vis pour fixation l unité qui sont supérieurs de l unité pour la section d alimentation électrique et de l unité pour la section de contact sortie 2 Remove the demand surveillance section unit Retirez l unité pour la section d alimentation électrique et de l unité pour la section de contact Raise Relevez Push Appuyez Unit fixing hook Crochet pour fixation l unité 3 Mount two panel mo...

Page 22: ...n unit and the contact output section unit Montez l unité pour la section d alimentation électrique et l unité pour la section de contact de sortie Unit fixing hook Crochet pour fixation l unité Unit fixing protrusion Saillie de fixation l unité Unit fixing lever Levier de fixation l unité Unit fixing hole L unité a arrangé le trou 8 Tighten the unit fixing screws on the top of the power supply se...

Page 23: ... Open the battery cover on the bottom of the server section 4 Remove the battery from the holder 5 Insert a new battery into the holder in the correct orientation and connect the lead connector to the connector 6 Close the battery cover 7 Turn the product on Cautions Make sure to perform battery replacement with power turned off Complete battery replacement within 3 minutes If 3 minutes passes wit...

Page 24: ... product set the battery switch on the demand monitoring section to ON Turning off the programmable logic controller with this switch set to OFF will reset the clock setting to the default value 0 00 1 1 2012 Note Build in clock in demand monitoring section will not be backup by the battery in C language controller Please make sure to set BAT SW to ON before demand monitoring ...

Page 25: ...8 10 1 192 168 10 xx xx is a value from 2 to 254 The upper 3 digits should be consistent with those for the product 5 Use the configuration software to set an IP address for EcoWebServerIII Run the EcoWebServerIII setting software As the following sample by Windows 7 displayed content might be different by OSs and installed applications Start menu All Programs Mitsubishi Energy Saving Management A...

Page 26: ...ject management window Or Select Double click here to create a new project and click Open Configure the following settings in the Create New Project window and click OK Project name Optional Specify a name such as Factory A or Floor B so that you can recognize it as a project for EcoWebServer III IP address 192 168 10 1 Specify the factory default IP address Subnet mask 255 255 255 0 Default gatew...

Page 27: ...in the tree menu 8 Read the network information Click Read the network information Clicking the button displays the network information read confirmation message Yes Executes network information reading No Cancels network information reading After reading is completed the messsage below is displayed ClickOK 画像差し替え必要 ...

Page 28: ...he following figure shows an example of changing the IP address to 10 123 234 10 Type an IP address subnet mask and default gateway to be used for operation 10 Type a maintenance password factory default ecopass in Password and click Apply In the confirmation dialog box that appears after you click Change click Yes When the IP address configuration is complete the following dialog box appears Clic...

Page 29: ...es to complete Check to see that resetting is complete and the STA LED on the EcoWebServer III main unit turns on before starting communications 3 The values of IP address Subnet mask and Default gateway in the project information are also automatically updated with the new values 11 After changing the IP address for the product return the PC s IP address to its original address ...

Page 30: ...ch to the RUN position 7 3 Time limit synchronization of the demand surveillance section 1 Press TS time limit synchronization switch to synchronize the time limit Press the TS switch in synchronization with the switching on the hour or on the half hour of the time limit of the transaction electricity meter If the product is located at a distance from the transaction electricity meter The time lim...

Page 31: ...nd data of EcoWebServerIII is being saved in compact flash card It might cause data corruption by a power failure or an instant power Please consider UPS if the power failure is frequently occurred Please confirm the content to turn off EcoWebServerIII for maintenance Procedure refers to Names and functions of parts Note Voyez les remarques sur la page 3 Fil sous tension N est PAS permis Taille de...

Page 32: ...s setting Pour les réglages initiaux adresse IP fixation CH 1 LAN cable Straight or crossover Droit ou métissé PC Supplied CD Setting software Logiciel de réglages CH 2 8 2 2 For operation Pour opération CH 1 Hub Hub Client PC PC clientèle LAN cable Straight Câble de LAN Droit Hub Hub Intranet LAN network Réseau d intranet LAN CH 2 ...

Page 33: ... RTU convertor Convertisseur MODBUS TCP MODBUS RTU LAN cable Straight or crossover Câble de LAN Droit ou métissé Connect to MODBUS RTU terminal Connectez vous à la terminal MODBUS RTU LAN cable Straight or crossover Câble de LAN Droit ou métissé See the manual for the programmable logic controller for information on Ethernet connection of programmable logic controllers and link connection of compu...

Page 34: ...wing table so that it will not exceed the maximum transmission distance Réalisez le câblage selon la table suivante afin qu il n excède pas la distance de transmission maximale Communication speed Vitesse de la communication 156 kbps 625 bps 2 5 Mbps 5 Mbps 10 Mbps Cable length between stations Longueur du câble entre les stations 20 cm or longer 20 cm ou plus 20 cm or longer 20 cm ou plus 20 cm o...

Page 35: ...contact de sortie If the inrush current is larger perform any one of the following to reduce the impact of the inrush current Si le courant d afflux est grand réalisez l un des suivants pour diminuer l impact du courant d afflux Contact output section Resistor Load Contact output section Load Inductance Section de sortie contact résistance Charge Section de sortie contact Charge Inducteur Note Voy...

Page 36: ...tions and usage see Instruction Manual Configuration Earth terminal is support to be wiring to earth Un connected inside When an open collector transmitter is used as a reference meter This is an example for ME96SS series with option unit model ME 4210 SS96 in the following Reference meter C1A C1B VT CT AC 100 V Demand unit V1 V2 A A TA TB RT1 RT2 RT3 E ...

Page 37: ... count Intermittent vibration 5 to 9 Hz 3 5 mm 10 times in each axis X Y Z 9 to 150 Hz 9 8 m s 2 Continuous vibration 5 to 9 Hz 1 75 mm 9 to 150 Hz 4 9 m s 2 Impact resistance Conforming to JIS B 3502 IEC 61131 2 147 m s 2 3 times in each axis X Y Z Operating atmosphere No corrosive gas Operating altitude 2000 m or below Installation area Inside a control panel Overvoltage category 1 II or below C...

Page 38: ...e station units 42 units max C Number of local station intelligent device station units 26 units max D Number of reserved station units Unregistered station numbers between the station number 1 and the last station number are counted as reserved station units Communication method Broadcast polling method Synchronization method Frame synchronous method Encoding method NRZI method Transmission path ...

Page 39: ...substances In this degree however temporary conduction may be caused by accidental condensation IEC 60664 1 3 It is only for products with demand control function 4 If the product is reset when the battery s power interruption backup cannot function due to the expiry of the backup time or any other causes the time is initialized to the default value 0 00 1 1 2002 If you change the time of the prod...

Page 40: ...ay color 65 536 colors or more Input device A mouse and a keyboard English input system The system included in OS English version only External interface 10BASE T 100BASE TX Memory card reader when writing reading confirming a project via drive by setting software Web browser 2 Microsoft Internet Explorer 9 32 bit 10 32 bit or 11 32 bit Microsoft Edge Google Chrome 1 Note that the required memory ...

Page 41: ...41 10 Outline Dimensions 10 1 Outline dimensions 189 Front 104 122 5 4 5 Side Unit mm 122 5 97 5 Bottom ...

Page 42: ...t is no problem to remove the LAN port cap during the operating The top of panel wiring duct or component positions are indicated 80mm or more door 1 This length applies when the height of the wiring duct is 50mm or less If not the length should be 40mm or more 30mm or more 30mm or more 1 10mm or more 5mm or more 11 Options Item Model Note Replacement battery Server section Q6BAT Recommended repla...

Page 43: ...d on the 7 segment LED on the server section AC100 to 240V 10 15 50 60Hz is not connected to V1 V2 in demand terminal block It is possible to take the power from the power supply section E1 is displayed on the 7 segment LED on the server section Access to the internal memory has failed Reset the product E2 is displayed on the 7 segment LED on the server section Access to the CompactFlash memory ca...

Page 44: ...position to see all the LEDs except the POWER LED on the power supply section turn off and return the RESET SELECT switch to the central position This completes the initialization of the main unit memory Set up an IP address See 8 1 Setting IP address 14 Warranty For technical and non technical inquiries about the product contact the nearest Mitsubishi office or dealer This document and product ha...

Page 45: ...or any third party s claim against the user arising from the execution of the license of use granted to the user under the Agreement Article 5 Alteration of the Software by user Any modification of the Software by the user shall not be allowed without written permission from Mitsubishi Electric Mitsubishi Electric shall assume no responsibility for the Software that has been modified by the user A...

Page 46: ... the place of the rating label 定格銘板例 额定铭板参考例 Example of the rating label MES3 255C DM EN の例です 以 MES3 255C DM EN 为例 Example of MES3 255C DM EN is shown below 定格銘板位置 关于额定铭板的位置 The place of the rating label MES3 255B DM MES3 255C DM CN 本製品の定格銘板は右側面にあります 本产品的额定铭板在产品的右侧面 MES3 255C DM MES3 255C DM EN 本製品の定格銘板は右側面にあります The rating label can be found on the right side of the product 额定铭板 the rating label 定...

Page 47: ...d trademark of Cisco Corporation in the United States Android Chrome is a registered trademark of Google Inc Safari is a registered trademark of Google Inc Ethernet is a registered trademark of Xerox Corporation in the United States MODBUS is a registered trademark of Schneider Automation Inc QR Code is a registered trademark of Denso Wave Incorporated EcoWebServer is a registered trademark of Mit...

Page 48: ... 82 2 3660 9572 Laos AROUNKIT CORPORATION IMPORT EXPORT SOLE CO LTD SAPHANMO VILLAGE SAYSETHA DISTRICT VIENTIANE CAPITAL LAOS 856 20 415899 Lebanon Comptoir d Electricite Generale Liban Cebaco Center Block A Autostrade Dora P O Box 11 2597 Beirut Lebanon 961 1 240445 Lithuania Rifas UAB Tinklu 29A LT 5300 Panevezys Lithuania 370 0 45 582 728 Malaysia Mittric Sdn Bhd No 5 Jalan Pemberita U1 49 Tema...

Reviews: