
4.0 Mechanical Installation and Dimensions
6
4.1 Main Chassis Installation
The Main Chassis is pre-installed in the BPS-1100 Enclosure as shown. Group the incoming wires through the top of
the enclosure to prepare it for wiring to the Modules. Do not run the wires in-between the Modules since it could
cause a short circuit. Use a wire tie to group wires for easy identification and neatness. Be sure to connect a solid
Earth Ground (from building system ground / to a cold water pipe) to the Chassis Earth Ground Mounting Lug, and
to connect the Earth Ground Wire Lugs from the Main Chassis to the ground screw on the Backbox.
Figure 2: Main Chassis Installation
Note:
DO NOT install cable through bottom of the box.
This space is reserved for Batteries.
MAIN CHASSIS
EARTH GROUND LUG
GROUND
CHASSIS
BACKBOX
#8-32 HEXNUTS (4X)
#8 x 1/4" TYPE `B' SCREW
SELECT
CONFIRM
INPUT 4
INPUT 3
INPUT 2
INPUT 1
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 1
OUTPUT 7
OUTPUT 8
OUTPUT 9
OUTPUT 10
OUTPUT 11
OUTPUT 12
OUTPUT 13
OUTPUT 14
OUTPUT 15
OUTPUT 16
OUTPUT 17
OUTPUT 18
OUTPUT 19
OUTPUT 20
CONFIG.
O/P ZONE
DISCONNECT
I/P ZONE
DISCONNECT
O/P ZONE
DISCONNECT
O/P ZONE
DISCONNECT