5.4.9
Overview Weighing Points
In this menu item, you can conigure the overview of weighing points in the visualization.
Configuration
@admin
Inputs
Outputs
Modbus-TCP master
Limits
Parameters
Production lines
Local control
Overview weighing points
View weighing point
Simulation
Overview weighing points
@admin
Overview weighing points
Status weighing point
1st line
2nd line
3rd line
4th line
5th line
6th line
enabled
active
WP status material
Recipe
Difference
Production line
Actual
Blank line
Default
Save
[Overview weighing points]
If [enabled] was selected, the overview is also included in the visualization.
[Status WP]
If [in use] was selected, a maximum of 6 lines can be displayed.
WP status material is displayed in line 1.
Possible selection for line 2…6:
Production line, Recipe name, target value, actual value, diference (between target
value and actual value), Gross, Blank line.
1. Select and conirm [Overview weighing points] using the cursor.
A selection window appears.
2. Select and conirm the individual settings.
Phase PR 5900/81
5 Getting started
EN-44
Minebea Intec
Summary of Contents for Maxxis 5 Phase PR 5900/81
Page 80: ...from weighing point independently Phase PR 5900 81 8 SPM EN 78 Minebea Intec...
Page 81: ...from weighing point independently 8 SPM Phase PR 5900 81 Minebea Intec EN 79...
Page 82: ...from weighing point independently Phase PR 5900 81 8 SPM EN 80 Minebea Intec...
Page 83: ...from weighing point independently 8 SPM Phase PR 5900 81 Minebea Intec EN 81...
Page 84: ...from weighing point independently Phase PR 5900 81 8 SPM EN 82 Minebea Intec...
Page 85: ...from weighing point independently 8 SPM Phase PR 5900 81 Minebea Intec EN 83...
Page 86: ...from weighing point independently Phase PR 5900 81 8 SPM EN 84 Minebea Intec...
Page 87: ...from weighing point independently 8 SPM Phase PR 5900 81 Minebea Intec EN 85...
Page 88: ...from weighing point independently Phase PR 5900 81 8 SPM EN 86 Minebea Intec...
Page 89: ...from weighing point independently 8 SPM Phase PR 5900 81 Minebea Intec EN 87...
Page 90: ...from weighing point independently Phase PR 5900 81 8 SPM EN 88 Minebea Intec...
Page 91: ...from weighing point independently 8 SPM Phase PR 5900 81 Minebea Intec EN 89...
Page 92: ...from weighing point independently Phase PR 5900 81 8 SPM EN 90 Minebea Intec...