VS 9/VS 8 Vital Signs Monitor Service Manual
4-15
Figure 6 Ground Resistance Test
Procedure
Procedure of the ground resistance test:
1. Connect the device to be test and the analyzer according to the connection diagram.
2. Press
Ω
on the panel.
3. Connect one end of the test lead to the
jack and the other end of the test
lead to the
(zero) jack.
4. Press the function key
Zero Leads
. The analyzer resets the measured value to zero to
offset the resistance of the test lead.
5. Remove the test lead from the terminal
and connect it to the ground point
of the protective ground column of the device or the metal shell part of the device.
Read the ground resistance.
6. After the device is connected, the measured resistance will be displayed.
7. Record the largest reading.
The ground resistance should not exceed 300 mOhms.
Summary of Contents for VS8
Page 1: ...VS9 VS8 Vital Signs Monitor Service Manual ...
Page 2: ......
Page 8: ...VI VS 9 VS 8 Vital Signs Monitor Service Manual FOR YOUR NOTES ...
Page 36: ...3 12 VS 9 VS 8 Vital Signs Monitor Service Manual FOR YOUR NOTES ...
Page 62: ...4 26 VS 9 VS 8 Vital Signs Monitor Service Manual FOR YOUR NOTES ...
Page 140: ...8 12 VS 9 VS 8 Vital Signs Monitor Service Manual FOR YOUR NOTES ...
Page 155: ......
Page 156: ...PN 046 020105 00 2 0 ...