Chapter 5 Test and Material List
60
Zero Calibration of Transducer
Select CH1, the system will zero IBP1. Select CH2, the system will zero IBP2.
Cautions:
( Use the PM-6000 IBP module as a example)
Turn off patient stopcock before you start the zero procedure.
The transducer must be vented to atmospheric pressure before the zero procedure.
The transducer should be placed at the same height level with the heart, approximately
mid-axially line.
Zero procedure should be performed before starting the monitoring and at least once a
day after each disconnect-and-connect of the cable.
Figure 5-3 IBP Zero
5.3.2 IBP Calibration
Press CAL button on the IBP module to call up the IBP PRESSURE CALIBRATE menu as
shown below:
Summary of Contents for PM-7000
Page 1: ...PM 7000 Patient Monitor Service Manual ...
Page 2: ......
Page 58: ...Chapter 3 Product Specifications 46 line 2 5m ENF 350 ms Delay time 4s ...
Page 81: ......
Page 82: ...P N 7001 20 67407 1 0 ...