Installation
63
Natural stone worktops
You will need heavy-duty double-side
tape (not supplied) to secure the
spacer bars.
Stick the tape onto the upper edge of
the cut-out or onto the lower step of
the stepped cut-out.
Position the spacer bars flush onto
the upper edge of the cut-out or onto
the lower step of the stepped cut-out.
Press the spacer bars firmly into
place.
Installing the SmartLine ele-
ment
Stick the supplied sealing strip under
the edge of the SmartLine element.
Do not apply the sealing strip under
tension.
Feed the mains connection cable
down through the cut-out.
Position the SmartLine element in the
worktop cut-out. When doing this
make sure that the seal of the appli-
ance sits flush with the worktop on all
sides. This is important to ensure an
effective seal all round.
Onset installation
If the seal does not meet the worktop
correctly on the corners, carefully
scribe the corner radii (
≤
R4) with a
jigsaw.
Do not use any additional sealant
(e.g. silicone) on the SmartLine ele-
ment.
Connect the SmartLine element to
the mains.
If required, connect the SmartLine
element to the gas supply (see “Gas
connection”).
Check that the SmartLine element
works.
Seal the gaps between the individual
elements with a silicone sealant that
is heat-resistant to at least 160 °C.
Summary of Contents for SmartLine CS 7611
Page 15: ...Guide to the appliance 15 Wok a Wok basin b Controls Indicators ...
Page 53: ...Building in dimensions 53 Onset installation a Front b Mains connection cable L 2000 mm ...
Page 68: ......
Page 69: ......
Page 70: ......