Operation
61
Low fill levels
When the fill level is low in one of the containers, e.g., for process
chemicals or the salt reservoir, you are prompted to refill the
container.
Refill salt
Refill DOS
Acknowledge the messages with
OK
and refill the relevant
containers. To do this, follow the instructions in the sections
“Adding and dispensing process chemicals” and “Water softener”.
Spray pressure and spray arm monitoring
The machine has a sensor for monitoring spray pressure in order, for
example, to detect pressure fluctuations due to misloading or foam in
the water circulation system. Spray pressure monitoring is set at the
factory to be active in the “Cleaning” and “Final rinse” wash blocks.
The spray pressure monitoring result is documented together with an
optional process documentation.
Spray arm speed can also be monitored, e.g. for prompt detection of
blockages due to misloading or foam in the water circulation system.
Spray arm speed monitoring can be activated or deactivated via the
programmable settings.
Miele Service can make further settings for spray pressure and spray
arm monitoring.