Commissioning
27
Commissioning
completed
Commissioning is completed when the following message is
displayed.
Set up successful
Confirm the message with
OK
.
The machine is now ready for use.
Universal
Temperature
Duration
h
1:30
75 °C
The settings made during the commissioning process are only
adopted after a complete program has been run.
Select any program, e.g.:
Drain
.
Press the
Start/Stop
button to start the program.
After commissioning every program starts with reactivation of the
water softener.
Fault 420
If the program is canceled using
Fault 420
, all the plumbing
connections are deactivated.
Confirm the error message with
OK
.
Switch the machine off using the
button.
Wait approximately 10 seconds before switching the machine on
again with the
button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing
connection; e.g. for cold water.