To use the Up/Down arrows:
1. In the Title area of the Scan Job Queue window, select the
scan job to be moved up or down.
2. Click on the
Up
or
Down
arrow to change the sequential order
of the scan jobs in the list. When you start scanning, the scan
jobs will be processed and scanned in the order that they
appear in the Scan Job Queue window (i.e., the scan job at the
top is scanned first; then the second scan job under it is
scanned second, etc.).
Summary of Contents for ScanMaker 6100 Pro
Page 66: ... Load Save ...
Page 104: ......
Page 144: ...Brightness and Contrast dialog box ...
Page 145: ...Color Correction dialog box ...
Page 146: ...Color Correction dialog box ...
Page 147: ...Tone Curve dialog box ...
Page 148: ...Brightness and Contrast dialog box ...
Page 149: ...Tone Curve dialog box ...
Page 150: ...Settings window ...
Page 151: ...Descreen ...
Page 152: ...Descreen ...
Page 153: ...Filters ...
Page 154: ...Filters ...
Page 155: ...Image Quality ...
Page 156: ...Fast JPEG Quality ...
Page 161: ...Threshold dialog box ...
Page 162: ...Threshold dialog box ...