
Operating Instructions Synchroprint 5000
Operating instructions SP5000 V1-0.docx
Page 16 of 52
6.
Commissioning the Synchroprint
After the initial start-up of the machine, commissioning is to be completed in the presence of the
authorized technician along with any persons authorized on the part of the customer. During this
initial start-up and commissioning, all tasks carried out by the MHM service engineer or the
technicians of an authorized dealer are recorded.
This installation/job sheet must be clearly signed by both parties, stating the date and location of the
Synchroprint and will be legally binding hereon after.
7.
Design and Operation
This section describes design and operation and indicates the individual assemblies.
7.1.
General Process Description
The operator applies a substrate (usually a T-shirt or paper) to the pallets at the locating surface.
Textiles will be fixed in position by means of the spray adhesive applied to the pallets beforehand.
For paper a special vacuum model is necessary to hold the substrate on the pallet by means of
negative pressure. Subsequently, the carrousel moves the substrate to the first print station, where
the substrate is printed by means of screen printing or treated with optional accessories.
Subsequently, the substrate moves to the second station, where it is treated again, before the process
continues with all other stations. Finally, the substrate arrives at the unloading point, where an
operator takes it from the machine for further processing.
Any defects or complaints must be brought to the attention of the authorized
technician, documented in writing and recorded immediately on the service
technician’s installation/jobsheet.
Before starting the machine, mains connection and compressed-air supply
must be checked and, if necessary, established according to the instructions.
Initial start-up of the Synchroprint should only be carried out by an authorised
MHM service engineer or by an approved technician from an official MHM
dealer/agent.