![Metronix DIS-2 48/10 FB FS STO Manual Download Page 84](http://html.mh-extra.com/html/metronix/dis-2-48-10-fb-fs-sto/dis-2-48-10-fb-fs-sto_manual_1780032084.webp)
Page 84
Function and data blocks for SIEMENS S7
PROFIBUS-Manual Servo positioning controller DIS-2 48/10 FB
Version 2.0
13.2.5
Creating an S7 program
First start the STEP 7 software. After the start of the SIMATIC Manager, the STEP7 Wizard is opened.
Follow the instructions of the STEP 7 Wizard. The STEP 7 Wizard leads you step by step through the
creation of an S7 project.
Then select the organization module
OB1
.
OB1
is located at the top program level and organizes all
the other modules.
Additional modules can be added later.
After that, select the preferred programming language. This language can be converted into other
programming languages later.
13.2.6
Integrating the GSD file
As a next step, the hardware of the PLC system used must be configured in the project created. To do
so, select
SIMATIC 300
in the left pane. Then double-click on
Hardware
in the right pane.
Close the station by clicking on
Station
->
Close
, without quitting the hardware configuration program.